Do you want to publish a course? Click here

Using performance indicators to evaluate school buildings status in Tartous city

استخدام مؤشرات الأداء لتقويم حالة المباني المدرسية ضمن مدينة طرطوس

1697   0   68   0 ( 0 )
 Publication date 2016
and research's language is العربية
 Created by Shamra Editor




Ask ChatGPT about the research

School buildings in Syria suffer of the high cost of maintenance works. In addition, there is no fear methodology to organize the maintenance process and evaluate the performance of these buildings. This research aims to develop a system for evaluating the performance of school buildings in the city of Tartous, in order to be used in the maintenance policy for these buildings and other buildings in other regions. The evaluating process is executed by calculating a performance indicator, which defines the state of the building depending on three sub-indicators: functional, technical and healthiness indicator. Maintenance manual and evaluating lists were developed to evaluate the components of school building. In addition, many questionnaires were set to determine the relative importance for each component of school building. The improved model was used to calculate the performance indicators for several schools. As a result, most of these schools were in a moderate situation. Also, the results clarify that some components have law state comparing to other ones and we should focus on them in organized maintenance processes.

References used
GULVANESSIAN, H.; CALGARO, J. & HOLICKY, M. Designer's guide to EN 1990: eurocode: basis of structural design. Thomas Telford Ltd, London, 2002,164
BS 3811:1993. Glossary of maintenance management terms in terotechnology. BSI, 1993, 52
HOWARD, M. Best practices maintenance plan for school buildings. State of Idaho, 2006, 19
rate research

Read More

Architectural design process is relatively complex considered due to the different content with users difference, therefore, each design has its own advantages that are difficult to standardize the process, as some have seen as architectural design that is a process of producing a one-time, making it difficult architectural design quality measurement result of not atypical The criteria used. Architectural design will be addressed as a result of a series of decisions on the key aspects that make up the elements of quality in design and that it must work to improve the quality of any design process. The research presents a theoretical study on the global architectural design used for quality assessment tools (eg DQI, DEEP, AEDET, HQI, LEED, BREEAM, BQA) to see the certified quality standards in each tool as a step towards the formation of a general framework for the concept of the architectural design of residential buildings quality of during a field study of the standards derived to determine the architectural design standards for residential buildings in Latakia The research found a set of standards governing the quality of the architectural design of residential buildings in Lattakia.
This research includes evaluating the work of maintenance of themachines through their own key performance indicators (KPI), and approved byindustrial and service companies, We mention reliability, readiness ,average time between failures, average Repair time ,average time of periodic maintenance of their production and serviceequipment. After the data processing of emergency failures and periodic maintenanceof machines , we extracted values for maintenance performanceindicators, we measured their performance and correlation to evaluateits compatibility with global indicators. The research aim to assess the current situation through the use ofquantitative methods pattern which is used to access the values of theprevious mentioned performance indicators and their interdependence tobe used in support of maintenance decisionsin the container terminal later. We noticed a strong inverse association between periodic maintenance TPMtime and breakdown TBD, and reached a value rERS = -0.99, and thereforewe must focus on increasing periodic maintenance to reduce breakdowntime, and replace parts that cause recurringproblems which caused about intensive breakdowns, thus reducing periodicmaintenance time. Also we were able to classify the quality of maintenance and machinesthrough the readiness and reliability indicators and the mean timebetween failures.
The purpose of this study is to determine the role of governance mechanisms to improve performance (financial, institutional and functional) for government corporations as a whole. In addition to the role of corporate governance in facing corruption and nepotism as well, it consistently predicts the long-term or failure in their financial performance.
This study aimed to assessing the role of school administration in health education in basic education schools in Lattakia city. The researcher used analytical descriptive method. The questionnaire was used to collect the study data from 30 principal s, who were chosen by using simple random sample. The findings indicated that the degree of the role of the school administration in health education in basic education schools of Lattakia city was low average as a whole is (2.42). The degree in achieving the means of health and safety was low average is (2.58), securing good environment suitable for good nutrition was low average is (2.25), and health culture was the lowest average is (2.10). Where achieving hygiene was the highest average is (2.78). This study recommended exploiting and following the applying of the health education programs. Developing the health culture programs of the school pupils and activating the role of health guide in school health field by holding seminars, training courses and sessions.
Economic growth and high competition have put a strong pressure on construction companies to improve their productivity and performance. Many studies on performance measurement have been carried out at the project level. Recently, the demand for perf ormance evaluation at the company level has increased. This paper aims to identify a set of Key Performance Indicators (KPIs). A List of 20 potential performance indicators has been identified according to Balance Score Card (BSC) through a quantitative and qualitative analysis. We have obtained the required information about the relative importance of the indicators through interviews with six experts in the construction industry to determine the size of the relative importance of each indicator, on the grounds that a large number of performance indicators are difficult to measure and control. We have adopted the Analytic Hierarchy Process (AHP) to identify fewer and more effective performance indicators. And we have used Expert Choice software to analyze expert answers. As a result, we have obtained 9 important indicators which can be directly used as indicators to measure and identify performance projects or as indicators within an integrated system, for performance measurement and tracking helps in improving the performance of construction projects in Syria.
comments
Fetching comments Fetching comments
Sign in to be able to follow your search criteria
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا