Do you want to publish a course? Click here

Comparing Building Information Modeling (BIM) System With Traditional CAD System in Design Phase

مقارنة استخدام نظام نمذجة معلومات البناء بأنظمة الكاد التقليدية في مرحلة التصميم

3762   3   59   0 ( 0 )
 Publication date 2014
and research's language is العربية
 Created by Shamra Editor




Ask ChatGPT about the research

Design phase is one of the phases that can largely affects the lowering of performance level, i.e. conflicts in design documents, numerous modifications to be performed and the difficulty that causeatlate stages of the design process, and consequently delay in delivery and sometimes fail to reach the project objectives. Building Information Modeling (BIM) system is one of the effective methodologies that offers many privileges that could take part in solving these problems. The purpose of this study is revealing the influence of implementing BIM in design phase, by comparing it with traditional CAD-based systems. Case studies have been conducted for projects of residential buildings during design phase in architectural part. Findings indicate that implementing BIM in design phase for architectural discipline have shortened the time needed for producing design documents by 75%. This study could be utilized by any company working in the architectural design field, and encourages decision makers to start using BIM. Furthermore there still is a need foran extensive studies to imply other kinds of buildings and more disciplines of AEC industry.


Artificial intelligence review:
Research summary
تتناول هذه الدراسة مقارنة بين نظام نمذجة معلومات البناء (BIM) وأنظمة التصميم بمعونة الحاسب التقليدية (CAD) في مرحلة التصميم. يهدف البحث إلى إظهار فعالية إدخال نظام BIM في مرحلة التصميم من خلال دراسة حالات متعددة لمشاريع فعلية تتعلق بالأبنية السكنية. تشير النتائج إلى أن استخدام BIM يمكن أن يقلل الوقت اللازم لإنتاج الوثائق التصميمية بنسبة تصل إلى 75%. تُظهر الدراسة أن BIM يقدم العديد من المزايا مثل تقليل الأخطاء التصميمية، تحسين التناسق بين الوثائق، وتسهيل إجراء التعديلات. كما تشجع الدراسة الشركات والمؤسسات الهندسية على تبني نظام BIM لتحسين كفاءة وفعالية عملية التصميم. ومع ذلك، تظل الحاجة قائمة لإجراء مزيد من الدراسات على أنواع أخرى من المباني والتخصصات الهندسية المختلفة.
Critical review
دراسة نقدية: على الرغم من أن البحث يقدم نتائج مشجعة حول فعالية نظام BIM في تحسين عملية التصميم، إلا أن هناك بعض النقاط التي تحتاج إلى مزيد من التوضيح. أولاً، الدراسة تركز فقط على الأبنية السكنية ولم تشمل أنواع أخرى من المباني مثل المباني التجارية أو الصناعية، مما يحد من تعميم النتائج. ثانياً، لم يتم التطرق بشكل كافٍ إلى التحديات التي قد تواجه الشركات في تبني نظام BIM، مثل التكلفة العالية للتدريب والتكيف مع التكنولوجيا الجديدة. ثالثاً، على الرغم من أن الدراسة تشير إلى تقليل الوقت بنسبة 75%، إلا أنها لم توضح بشكل دقيق كيفية حساب هذه النسبة وما إذا كانت تشمل جميع جوانب عملية التصميم أم فقط بعض الأجزاء منها. وأخيراً، كان من الأفضل تضمين آراء المستخدمين النهائيين والمصممين الذين استخدموا النظامين لتقديم صورة أكثر شمولية عن الفروقات بينهما.
Questions related to the research
  1. ما هي الفائدة الرئيسية لاستخدام نظام BIM في مرحلة التصميم؟

    الفائدة الرئيسية لاستخدام نظام BIM في مرحلة التصميم هي تقليل الوقت اللازم لإنتاج الوثائق التصميمية بنسبة تصل إلى 75%، بالإضافة إلى تحسين التناسق بين الوثائق وتقليل الأخطاء التصميمية.

  2. ما هي التحديات التي قد تواجه الشركات في تبني نظام BIM؟

    التحديات التي قد تواجه الشركات في تبني نظام BIM تشمل التكلفة العالية للتدريب والتكيف مع التكنولوجيا الجديدة، بالإضافة إلى الحاجة إلى تغيير الثقافة التنظيمية والتغلب على مقاومة التغيير من قبل الموظفين.

  3. هل شملت الدراسة أنواع أخرى من المباني غير الأبنية السكنية؟

    لا، الدراسة ركزت فقط على الأبنية السكنية ولم تشمل أنواع أخرى من المباني مثل المباني التجارية أو الصناعية.

  4. ما هي النقاط التي تحتاج إلى مزيد من التوضيح في الدراسة؟

    النقاط التي تحتاج إلى مزيد من التوضيح تشمل كيفية حساب نسبة تقليل الوقت بنسبة 75%، التحديات التي قد تواجه الشركات في تبني نظام BIM، وتضمين آراء المستخدمين النهائيين والمصممين لتقديم صورة أكثر شمولية عن الفروقات بين النظامين.


References used
SHEN, Z.; ISSA, R. R. Quantitative evaluation of the BIM-assisted construction detailed cost estimates. ITcon, Vol. 15, 2010, 234-257
KYMMELL, W. Building information modeling: planning and managing construction projects with 4D CAD and simulations. McGraw-Hill New York, 2008, p 270
EASTMAN, C.; TEICHOLZ, P.; SACKS, R.; LISTON, K. BIM handbook: a guide to building information modeling for owners, managers, designers, engineers, and contractors. 2nd ed., Wiley, 2011, p 626
SUCCAR, B. Building information modelling framework: A research and delivery foundation for industry stakeholders. Automation in Construction, Vol. 18, No. 3, 2009, 357-375
KRAUS, W.; WATT, S.; LARSON, P. Challenges in estimating costs using building information modeling. AACE International Transactions, 2007, 11-13
rate research

Read More

This paper addresses the subject of design changes management in the context of a multidisciplinary collaborative Building Information Models (BIM) environment. Within Building projects organization field, This research aims to use change managemen t as tool for design and decision making. The proposed method for the management of design changes depends on both modeling the elements of structure based on BIM and using parameter-based design structure matrix as tool for Change Management in a way that will support the effective flow of information between disciplines, and thus reduces design changes, and will be able to trace a series of successive changes within the BIM environment. This paper offers different necessary models to build the DSM; then they are fed by the information of a commercial building project collected from design engineers. The proposed method represents the various dependencies between the parameters of building and evaluates their impact on the levels of elements, the whole system and subsystems in a way that allows to identify the critical parameters and predict some of the iterative cycles of change to avoid unnecessary rework.
Building maintenance is gaining an increasing attention in the field of scientific research and there was a need for the use of new technologies in maintenance management, , as the facility management deal with a large amount of information relatin g to maintenance, which includes drawings and specifications, lists, and reports, and the use of paper files leads to decrease the efficiency and create a shortage of data and information. We offer in this research tool to manage the maintenance process by using the BIM through linking deterioration models and three-dimensional model of the facility to be maintained, then compensate the external investigation data for maintenance work in these models, to get at the end of this research and with the help of the possibilities offered by Revit database to an upcoming maintenance items and arrange them according to their importance and impact on the facility , the estimated budget for the periodic maintenance and distribution of this budget on the various construction elements , the development of resources plan for next year and up to the knowledge database of maintenance will help in determining the supplier lifecycle and the coefficient of replacement.
The purpose of research is to build a model of the electric driving system for threephase squirrel-cage induction motor using oriented electric field method so as to control both the speed , flux and current, ( PI ) controllers was used . The mach ine model has been formed based on the equations of the machine written in the stationary coordinates . To complete the process of control without measuring the rotor flux , a model of flux from the measured values of stator current and rotor speed was build, and it can be measured directly .
تحتل الدراسات التي تتناول حوسبة اللغة العربية أهمية كبيرة نظراً للانتشار الواسع للغة العربية , و اخترنا في هذه الدراسة العمل على معالجة اللغة العربية من خلال نظام استرجاع معلومات للمستندات باللغة العربية , الفكرة الأساسية لهذا النظام هو تحليل المستن دات والنصوص العربية و إنشاء فهارس للمصطلحات الواردة فيها , ومن ثم استخلاص أشعة أوزان تعبر عن هذه المستندات من أجل المعالجة اللاحقة للاستعلام و المقارنة مع هذه الأشعة للحصول على المستندات الموافقة لهذا الاستعلام . من خلال عملية تجريد للمصطلحات الواردة في المستندات تم الحصول على كفاءة استرجاع أفضل , و تعرضنا للعديد من خوارزميات التجريد التي وصلت إليها الدراسات السابقة . و تأتي عملية عنقدة المستندات كإضافة هامة , حيث يتمكن المستخدم من معرفة المستندات المشابهة لنتيجة البحث و التي لها صلة بـالاستعلام المدخل . في التطبيق العملي , تم العمل على نظام استرجاع معلومات مكتبي , يقوم بقراءة نصوص ذات أنواع مختلفة و عرض النتائج مع العناقيد الموافقة لها .
This study aimed to describe the water erosion modeling in Daher Aljabal and its surrounding areas in Al-Sowaida Governorate based on GIA and RS. The water erosion risk map was obtained by applying GIS model developed on the basis of ten factors i nfluencing the erosion process. GIS layers were built for every factor. The weights for all factors were added together. Based on sum of these factors, water erosion was divided into six erosion risk levels. Results showed that 12% of the study area was classified in levels 5 and 6, which reflect high and very high water erosion risks. Land topography was the main factor in water soil erosion. Terraces are effective ways to decrease the water soil erodability. Results also showed that GIS and RS were powerful tools in water erosion risk assessment mapping.
comments
Fetching comments Fetching comments
Sign in to be able to follow your search criteria
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا