Management of Design Changes within Building Information Models by Using Design Structure Matrix

إدارة تغييرات التصميم ضمن نمذجة معلومات البناء باستخدام مصفوفة هيكلية التصميم

1931   5   29   0 ( 0 )
 Publication date 2016
and research's language is العربية
 Created by Shamra Editor




Ask ChatGPT about the research

This paper addresses the subject of design changes management in the context of a multidisciplinary collaborative Building Information Models (BIM) environment. Within Building projects organization field, This research aims to use change management as tool for design and decision making. The proposed method for the management of design changes depends on both modeling the elements of structure based on BIM and using parameter-based design structure matrix as tool for Change Management in a way that will support the effective flow of information between disciplines, and thus reduces design changes, and will be able to trace a series of successive changes within the BIM environment. This paper offers different necessary models to build the DSM; then they are fed by the information of a commercial building project collected from design engineers. The proposed method represents the various dependencies between the parameters of building and evaluates their impact on the levels of elements, the whole system and subsystems in a way that allows to identify the critical parameters and predict some of the iterative cycles of change to avoid unnecessary rework.

References used
AKCAMETE, A.; AKINCI, B.; GARRETT, H.J. Motivation For Computational Support for Updating Building Information Models (Bims). International Workshop on Computing in Civil Engineering, ASCE, Austin, Texas, 2009
BLACK, T.A., FINE, C.F., & SACHS, E.M. A Method for Systems Design Using Precedence Relationships: An Application to Automotive Break Systems. Working Paper, MIT School of Management, Cambridge, MA,1990
BROWNING, T. R. Applying The Design Structure Matrix to System Decomposition and Integration Problems: A Review and New Directions. IEEE Transactions on Engineering Management, Vol.48, No.3, 2001, 292-306
rate research

Read More

Design phase is one of the phases that can largely affects the lowering of performance level, i.e. conflicts in design documents, numerous modifications to be performed and the difficulty that causeatlate stages of the design process, and consequentl y delay in delivery and sometimes fail to reach the project objectives. Building Information Modeling (BIM) system is one of the effective methodologies that offers many privileges that could take part in solving these problems. The purpose of this study is revealing the influence of implementing BIM in design phase, by comparing it with traditional CAD-based systems. Case studies have been conducted for projects of residential buildings during design phase in architectural part. Findings indicate that implementing BIM in design phase for architectural discipline have shortened the time needed for producing design documents by 75%. This study could be utilized by any company working in the architectural design field, and encourages decision makers to start using BIM. Furthermore there still is a need foran extensive studies to imply other kinds of buildings and more disciplines of AEC industry.
Building maintenance is gaining an increasing attention in the field of scientific research and there was a need for the use of new technologies in maintenance management, , as the facility management deal with a large amount of information relatin g to maintenance, which includes drawings and specifications, lists, and reports, and the use of paper files leads to decrease the efficiency and create a shortage of data and information. We offer in this research tool to manage the maintenance process by using the BIM through linking deterioration models and three-dimensional model of the facility to be maintained, then compensate the external investigation data for maintenance work in these models, to get at the end of this research and with the help of the possibilities offered by Revit database to an upcoming maintenance items and arrange them according to their importance and impact on the facility , the estimated budget for the periodic maintenance and distribution of this budget on the various construction elements , the development of resources plan for next year and up to the knowledge database of maintenance will help in determining the supplier lifecycle and the coefficient of replacement.
This paper describes a case study in which we documented six examples of design changes. Then they are analyzed in two directions, the first is related to assessing the efficiency of the tools of BIM towards design changes and discovering their weaknesses, while the second is related to analyzing the characteristics of these changes within the information model of BIM and presenting them in the modeling of the change process.
Most of the architectural studies are trying now to follow the new methods to solve the problems of energy waste, and inefficiency of our buildings. The energy is consumed out by all sectors of life randomly, and in particular in the construction s ector, which uses almost half of energy consumption. Therefore, this paper aims to clarify the most important methods and treatments used in order to enable our buildings to save energy and make use of environmental data .
Nowadays, the usage of NSAIDs has been increased dramatically for relieving pain and the treatment of divers inflammatory conditions, therefore, it is necessary to develop this class of drug by increasing their activity and decreasing their side e ffects. Their most common side effect is the gastrointestinal disorders, especially, gastric bleeding resulting from the inhibition of prostaglandins synthesis.
comments
Fetching comments Fetching comments
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا