Do you want to publish a course? Click here

The penalty for delay penalties is a financial penalty for the administrative contract. However, the delay fine has a special effect on the contractor with the administration. It is subject to a different legal system that is different from what it is It is in civil contracts It signaled a decision issued by the administration without resorting to the judiciary, and without the need to prove the damage, because the delay in the implementation of the administrative contract is in itself an injury to the public facility that monitors the contract for his benefit and thus harm the public interest which is the holy purpose of the administrative contract.
Recent descriptive study was conducted to identify occupational stressors among emergency department nurses and unites in three governmental hospitals in Latakia.
The theory of exceptional circumstances has emerged to enable the administrative control authorities to face the difficult crises and to provide them with the powers that allow them to take the measures required by the situation at the maximum spe ed, even if they contravene the ordinary laws, in order to preserve the objectives of the administration The defect that led to the disturbance of the general facility. The role of administrative control in the face of exceptional circumstances is of great importance. The legislator often extends these powers by constitutional provisions, such as those relating to the necessity regulations or special laws, such as emergency law and martial law .
Thousands of dams have been built around the world, but, the date of construction is associated with a history of failures and collapse, due to the high water levels, generating higher returns consequences disastrous for the environment and society , when dam fails released very large amounts of water threatened the lives of persons and property, it returns to the short time available for warning and evacuation. This paper provides an overview of the most important reasons for the collapse, with a study about possibility failure product from supposed breach in 16 Tishreen dam, caused by the flow of water over the top, where the predicted of breach that leading to collapse is done and determine its characteristics, namely: High, width, time required to development of the breach, the maximum flow out of it, and also generate flood maps that represent the limits of the spread of flood wave downstream, in addition tosuggest a simplified plan for the evacuation Results led to the flooded wave caused by the collapsehurtling loaded adischargeabout 54631 , causes a wall of water with 17 meters high moves through the downstream river with 14 m/sec speed, the wave spreadover 45.24 ,causing submerge for 7 villages the most important of it Stkhers and Rodo which are completely submerged, and 30 economical facility the most important of it industrial area that also completely submerged, the water depths ranged from 2 to 17 meter, which causing heavy casualtiesand damage about 30000 people, and more than 7000peopleare expected to die, unless the actual preparations of emergency plan.
Emergency cases can occur anytime, anywhere and to anyone. Such situations are somewhat more likely to occur within the confines of the dental office due to the increased level of stress which is so often present. This study aims to determine the readiness and the interest of dental clinic for the management of such cases.
Medical emergencies could occur during the practice of dentistry. A dentist must be prepared to recognize and manage of any potential emergency situation. The purposes of the study were to determine the occurrence of medical emergencies in Damascus dental clinics, and to assess the way patients' medical history is taken.
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا