In this study, a simulation of the MTR-22MW reactor and a study
of standard and mixed fuel combustion using the Codes GETERA
and MCNP5.
The Results of the simulation showed that the operation time of the
reactor in the case of standard fuel is 274 days and if the use of
mixed fuel is 135 days.
In this research proposed system components will be studied in
order to recover flare gases at outstations of the oil fields which not
connected to any gas plant, hence they send continuously the entire
associated gases to the flare, and how to de
termine the proposed
recovery system operating parameters in order to recover the
mentioned gases and reuse them in central process facilities, where
a number of gas turbines which have a dual system (gas - diesel)
located at Elwared central process facility consume a huge amount
of diesel, while the associated gas in Elwared related outstations
especially Elahmar burns (2.5 MMSCFD).