Studying of electrical power systems reliability using petri nets and apply it on medium voltage network of Balloran line in Lattakia

دراسة موثوقية أنظمة الطاقة الكهربائية اعتماداً على مفهوم شبكات بتري و تطبيقها على شبكة التوتر المتوسط لخط بلوران في اللاذقية

2779   5   121   0 ( 0 )
 Publication date 2015
and research's language is العربية
 Created by Shamra Editor




Ask ChatGPT about the research

The purpose of this study is to define the reliability index for electrical power systems specifically and without using alot of data and treating processes. Results of this study is useful in electrical networks planning and design because of its technical and economical importance in the optimal choosing of networks elements and connections. In this research we use petri nets concept to represent electrical nets under studying then simulate the equivalent chart on GRIF program to find reliability degree for the system and its elements. This research includes comparing the suggested methodology to a reference net and then apply this method on electrical local network to discuss the results. It has been proved that petri nets are effective in reliability calculations with the best of simulation methods.


Artificial intelligence review:
Research summary
تهدف هذه الدراسة إلى تحديد مؤشر الموثوقية لأنظمة الطاقة الكهربائية بدقة عالية وبدون الحاجة إلى الكثير من المدخلات وعمليات المعالجة. تعتمد الدراسة على استخدام مفهوم شبكات بتري لتمثيل الشبكات الكهربائية المدروسة، ومن ثم محاكاة المخطط المكافئ باستخدام برنامج GRIF لحساب درجة موثوقية النظام وعناصره. تتضمن الدراسة مقارنة منهجية الطريقة المقترحة مع شبكة مرجعية عالمية، وتطبيقها على شبكة كهربائية محلية في اللاذقية. أظهرت النتائج فعالية شبكات بتري في حساب الموثوقية بأفضل طرق المحاكاة، مما يسهم في تحسين تخطيط وتصميم الشبكات الكهربائية بشكل فني واقتصادي.
Critical review
دراسة نقدية: تعتبر هذه الدراسة خطوة مهمة في مجال تحسين موثوقية أنظمة الطاقة الكهربائية باستخدام شبكات بتري. ومع ذلك، يمكن توجيه بعض الانتقادات البناءة. أولاً، قد يكون من المفيد تقديم مزيد من التفاصيل حول كيفية اختيار الأعطال الرئيسية التي تمت محاكاتها، حيث أن هذا الاختيار يمكن أن يؤثر بشكل كبير على النتائج النهائية. ثانياً، بينما تم إثبات فعالية الطريقة على شبكة محلية، قد يكون من المفيد اختبارها على شبكات ذات تعقيد أكبر وتنوع في العناصر لتحسين تعميم النتائج. أخيراً، يمكن أن تكون الدراسة أكثر شمولاً إذا تضمنت مقارنة مع طرق أخرى لحساب الموثوقية، مما يعزز من مصداقية النتائج ويتيح فهماً أعمق للفروق بين مختلف الأساليب.
Questions related to the research
  1. ما هو الهدف الرئيسي من هذه الدراسة؟

    الهدف الرئيسي هو تحديد مؤشر الموثوقية لأنظمة الطاقة الكهربائية بدقة عالية وبدون الحاجة إلى الكثير من المدخلات وعمليات المعالجة، وذلك لتحسين تخطيط وتصميم الشبكات الكهربائية.

  2. ما هي الأداة المستخدمة في محاكاة شبكات بتري في هذه الدراسة؟

    تم استخدام برنامج GRIF لمحاكاة شبكات بتري وحساب درجة موثوقية النظام وعناصره.

  3. ما هي الشبكة المحلية التي تم تطبيق الدراسة عليها؟

    تم تطبيق الدراسة على شبكة التوتر المتوسط لخط بلوران في محافظة اللاذقية.

  4. ما هي الفائدة الاقتصادية والفنية من استخدام شبكات بتري في حساب الموثوقية؟

    استخدام شبكات بتري يسهم في تحسين اختيار عناصر الشبكة وطرق توصيلها بشكل أمثل، مما يؤدي إلى تحسين الموثوقية وتقليل التكاليف الاقتصادية.


References used
R. Billinton, R. N. Allan, “Power-system reliability in perspective”, IEE Electronics and Power, Vol. 30, No. 3, March 1984
GRIF 2014 petri nets with predicates, user manual, version 31, March 2014
Sozaski J. Reliability of power supply. – Scientific and Technical Publishing, Warsaw, 1990
rate research

Read More

The study seeks to determine the real time in electrical power system, which consists of generating, transmitting and distributing equipment by using redistributing active power of electrical generators in order to organizing the overload operation of electrical power transmission line loading in such case that the spare loads of electrical station are not covering the important and necessary loads at failures. The most of laws related to electrical power systems design indicated to proper ratio of real time of electrical power system equipment along with characteristics of probability distributed functions in addition to statistics methods which give a high possibility to reduce the real time of considered loads; so; this leads to the requested solutions which reduce the damage of failures at any time.
In this paper, we will design a Fuzzy Smith Predictor (FSP), then we will model, simulate and analyze it using colored Fuzzy Petri networks, then we will compare it with a conventional proportional integral controller. The main objective of this research is to reduce the delay time of the wind turbine system and to increase its reliability, in the other side, to improve the response and stability of the operating point of the mechanical energy and reduce vibration caused by the delay time in the system.
This research presents software programs that have been designed in order to evaluate the reliability in electrical distribution networks, by calculating the reliability indices for 20 kV distribution feeders. It is the first study in this field for the distribution network in Syria. First of all, the mathematical models of reliability have been presented.
This paper provides algebraic representation of Petri Nets model, taking advantage that the releasing principle of Petri Nets depends on reduction process of Monoiad of the commutative natural numbers. (In conclusion) Finally, we provided a theore m that explains how to make use of algebraic properties, to simulate Petri Nets algebraically and identify the results we will get after releasing a series of Petri Nets' transitions.
comments
Fetching comments Fetching comments
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا