Do you want to publish a course? Click here

In this study, a simulation of the MTR-22MW reactor and a study of standard and mixed fuel combustion using the Codes GETERA and MCNP5. The Results of the simulation showed that the operation time of the reactor in the case of standard fuel is 274 days and if the use of mixed fuel is 135 days.
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا