An approach to cost controlling of Concrete Bridges in Design Phase

مقاربة لضبط كلفة الجسور البيتونية في مراحل التصميم

1070   1   26   0 ( 0 )
 Publication date 2013
and research's language is العربية
 Created by Shamra Editor




Ask ChatGPT about the research

This researchdeals with the topic of controlling the cost of concrete bridge projects in the early design phase. The research aims at using cost controlling as an auxiliary tool for designing and decision making.Cost control methodology has been proposed based on modeling the elements of structure, and proposing a method forcost estimate. This method based on estimating of quantitiesfrom the general parameters of the structure and prices are being updated periodically.The proposed methodology studiesmany available alternatives that werechosen by the designer andevaluate thesealternativeseconomically.


Artificial intelligence review:
Research summary
يتناول هذا البحث موضوع ضبط كلفة مشاريع الجسور البيتونية خلال مرحلة التصميم المبكر. يهدف البحث إلى استخدام ضبط الكلفة كأداة مساعدة في التصميم واتخاذ القرار. تعتمد المنهجية المقترحة لضبط الكلفة على نمذجة عناصر المنشأ واقتراح طريقة لتقدير الكلفة تستند إلى تقدير الكميات انطلاقاً من بارامترات عامة للمنشأ وأسعار يجري تحديثها بشكل دوري. تقوم المنهجية بدراسة مختلف الحلول التقنية التي يختارها المصمم وتقييمها من الناحية الاقتصادية. تم عرض مختلف النماذج الضرورية لتصميم هيكلية قاعدة بيانات والتي تم إغذاؤها بالمعلومات التي جُمعت من مشاريع جسور مختلفة. يهدف البحث إلى تطوير منهجية لضبط كلفة مشاريع الجسور الطرقية خلال مراحل التصميم المبكر، واقتراح منهجية للمساعدة على التصميم واتخاذ القرار من خلال استثمار قاعدة البيانات بوساطة أداة برمجية. تم استخدام تقنيات تحليل الانحدار لتطوير نماذج رياضية لتقدير كمية كل بند من البنود الخاصة بعناصر المنشأ. تم تطبيق المنهجية المقترحة على عينة من الجسور للتحقق من دقتها وفعاليتها. النتائج أظهرت أن النماذج المقترحة لتقدير الكلفة الأولية أعطت نتائج جيدة ضمن حدود البيانات المستخدمة. كما تم اقتراح قاعدة بيانات لضبط الكلفة تتألف من مجموعة من الجداول التي تُترجم الروابط بين مجموعة من القيم. في النهاية، تم تقديم توصيات لتحسين دقة البيانات الميدانية وتعميم الدراسة على أنواع أخرى من مشاريع الجسور.
Critical review
دراسة نقدية: يعتبر البحث خطوة هامة نحو تحسين عملية ضبط كلفة مشاريع الجسور البيتونية خلال مراحل التصميم المبكر. ومع ذلك، يمكن الإشارة إلى بعض النقاط التي قد تحتاج إلى تحسين. أولاً، البيانات المستخدمة في تطوير النماذج قد تكون محدودة من حيث الحجم والنوع، مما قد يؤثر على دقة النتائج. لذا، يُفضل توسيع قاعدة البيانات لتشمل مجموعة أكبر من المشاريع. ثانياً، لم يتم التطرق بشكل كافٍ إلى تأثير العوامل الخارجية مثل التغيرات المناخية أو الاقتصادية على كلفة المشاريع، وهو ما يمكن أن يكون له تأثير كبير على دقة التقديرات. أخيراً، يمكن تحسين المنهجية من خلال دمج تقنيات الذكاء الاصطناعي والتعلم الآلي لتحسين دقة التقديرات وتقديم توصيات أكثر دقة.
Questions related to the research
  1. ما هي الأهداف الرئيسية لهذا البحث؟

    يهدف البحث إلى تطوير منهجية لضبط كلفة مشاريع الجسور الطرقية خلال مراحل التصميم المبكر، واقتراح منهجية للمساعدة على التصميم واتخاذ القرار من خلال استثمار قاعدة البيانات بوساطة أداة برمجية.

  2. ما هي المنهجية المستخدمة لضبط الكلفة في هذا البحث؟

    تعتمد المنهجية على نمذجة عناصر المنشأ واقتراح طريقة لتقدير الكلفة تستند إلى تقدير الكميات انطلاقاً من بارامترات عامة للمنشأ وأسعار يجري تحديثها بشكل دوري.

  3. ما هي التوصيات التي قدمها البحث لتحسين دقة البيانات الميدانية؟

    يوصي البحث بتحسين دقة البيانات الميدانية من خلال دراسة شريحة أكبر من مشاريع الجسور البلاطات، وتعميم الدراسة على أنواع أخرى من مشاريع الجسور، ودراسة عدم التأكد في تقدير الكلفة الأولية لمشاريع الجسور.

  4. كيف تم التحقق من دقة المنهجية المقترحة في هذا البحث؟

    تم التحقق من دقة المنهجية من خلال تطبيقها على عينة من الجسور لم تستخدم بياناتها أثناء تطوير النماذج البارامترية لتقدير الكميات، وأظهرت النتائج أن النماذج المقترحة لتقدير الكلفة الأولية أعطت نتائج جيدة ضمن حدود البيانات المستخدمة.


References used
Aparicio, A.C. ; Casas, J.R. ; Ramos, G.Computer Aided Design of PrestressedConcrete Highway Bridges,Computers and Structures, Vol.60,No.6, 1996, 957–969
Bernus, P.;Mertins,K.; Gunter, S.Handbook on Architectures of Information System,Business and Economics, U.S.A., 2006, 896
Cohn, M.Z. ;Lounis, Z. Optimal Design of Structural Concrete Bridge Systems. ASCE Journal of Structural Engineering, Vol. 120, No. 9, 1994, 2653–2674
rate research

Read More

Blast load caused emptying a large amount of energy very quickly parts of the second causing a significant increase of pressure, in addition to generating high temperatures because of the high speed often ends local effects of the explosion before the bridge begins to respond, which causing major damage in the bridge. Most of bridge design codes didn’t take in account during design the blast load, as well there are no codes inspection on bridges the blast load. The research aims to study and to facilitate the understanding of damages caused by explosion load on elements of road bridges through the facts of explosion and photographs the cases of damages occurring practical and realistic, and also through some computer models.It has been in the research review the impact of the blast load on the slab bridges. The distinction between the case of the impact of the blast load at top and bottom of slab bridge. So the case of the bombing at the top slab bridge leading to increase the binding moments and shear forces, in against the case of blasting at the bottom of slab bridges leads to act opposite load for design loads. Also studied blast load on bridge beams and illustrated resulting addional cross sections. Also explained the effect of blast load on bridge piers and abutments, and the forms of caused damages.
This research deals with the minimum cost design of reinforced concrete T-beams according to the Syrian code. The aim is to minimize the total cost of the beam while respecting all the design requirements. Traditional method depend on a set of supp ositions, in the opposite this methodology aim to reach the optimal solution among a set of constraints with respect the objective function. So that, using this methodology leading to the minimum cost reinforced section design. This research is shown that the problem can be formulated in a nonlinear mathematical programming format. Several cases are used to explain the applicability of the formulation in accordance with the current Syrian code. Traditional method of Syrian code has been used to design sections in this paper, utilizing the nonlinear programming method provided by Lingo14.0 software from LINDO Systems Inc. The comparison of the results shows that important saving can be obtained at the total cost of a reinforced concrete T-beams design.
There was within the last 50 years a lot of database applications in which time plays an important role. These applications revealed a lack in time support within the current DBMSs as the application should give the data the temporal semantics rela ted to it, also to check the temporal constraints. Therefore, researches were made in order to embed this temporal semantics and constraints in the DBMS itself, also to provide a new query language that can be tagged as “temporal”.
As a result of the scientific and technological progress in different types of industry, one of which, Construction industry, new materials and methods of executing and designing buildings are utilized in general. Therefore, finding the best and e conomical solution is one of the main issues addressed by the researchers in recent years. - Economical design i.e. researching best and most suitable solutions for specified load conditions and environment requires a good knowledge in calculation and designing methods, exacting and constructing methods and the types and prices of materials available locally. -This paper discusses the economical design of the reinforced concrete components specified for the basic forces(M,Q,N). Consequently, it is the economical design of the structural framework of the reinforced concrete buildings according to the main changes of materials price for constructing these structures at specific local conditions.
comments
Fetching comments Fetching comments
Sign in to be able to follow your search criteria
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا