Do you want to publish a course? Click here

The research aims to complete the study of the theory and operation of networks geodesic associated marine beach, whether horizontal or vertical, with display rods and devices used in completion of topographic survey of networks in both land and ma rine parts. In theoretical part it was addressed to specific shapes networks geodesic which distinguish maritime works beach that takes the form of the morphological characteristics of the natural land of each building proposed network, and the numerical characteristics of each building proposed networks. In the practical part the results of measurements and amendments was presented to some forms of executed geodesic beach networks for several forms of works: (topographic raise achievements within the existing and investor basin in order to establish a slider, completion of the cadastral beach works in order to determine distortions in the existing pier, clean the shipyard of silt and sediment. Software has been reviewed to assist in completing marine works, utmost to obtain the final marine charts. The research concluded that specific proposals on vertical geodetic networks studies, and identify the various parts of software related to marine works and ways to take advantage of them.
The objective of the research is to complete a theoretical and practical study related to coastal marine works in order to calculate the amounts of silt removal from harbor basins and entrances, and to present the methods and devices used in the pe rformance of topographic survey and numerical methods in the calculation and comparison of quantities. In the theoretical part, the factors that lead to the formation of silt deposits in the port basins, the methods of their removal and the deepening of the navigational pathways to enter and exit the harbors were addressed. In the practical part, the results, methods of measurements and topographic results were presented during the stages of investment of the port, at least two stages, at the beginning of the investment and before the process of direct withdrawal, and then calculating the quantities of the implemented and comparing them, to obtain maritime plans and final quantities. The research concluded with specific proposals on the methods of calculating the quantities of the isolated port, the method of constructing the measured geodetic networks, the achievement of the topographic elevation under the water surface, and the identification of the software parts related to the various marine works and ways of benefiting from them.
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا