After the analyzing of formation pressure data and pressure
interference tests between wells in Ash Shaer field, the field has
been divided initially into three main blocks, then a material
balance model has been built for the field using MBAL software.
This model has proved the previous result besides answering some
problems which hasn’t been solved by the analytical method.