The aim of this study is to develop a fuzzy inference model to estimate the impact of change orders on the duration of construction projects in Syria. This can help in obtaining the optimal estimation of the increasing of the project duration caus ed by the changes. The capability of gradient estimation of the fuzzy logic approach reduces the distrust of estimation using factor assessment. Also it estimates the duration of the project after any change.via the experts evaluation or according to the crisp logic.
The facilities in Syria are destroyed and damaged by terrorist acts of armed groups. Therefore, the construct managers should rehabilitate it logically and economically. This required accurate data about the structural nature and functional condit ions of the construct. However, the personal estimation of experts and the approximate structural conditions and functionality of construct for rehabilitation- inclines the decision makers from getting the exact estimate of the rehabilitation degrees. Therefore the aim of this research is to propose a set of indicators and criteria that can assist in selecting the construct that required to be rehabilitated according to its levels.
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا