At the Ibaraki Neutron Medical Research Center, an accelerator-based neutron source for iBNCT (Ibaraki - Boron Neutron Capture Therapy) is being developed using an 8-MeV proton linac and a beryllium-based neutron production target. The proton linac consists of an RFQ and a DTL, which is almost the same as the front part of J-PARC linac. However, here only one high-power klystron is used as the RF source to drive the two cavities, which have quite different Q-values and responses. From June 2016, a cPCI based digital feedback system was applied to the iBNCT accelerator. It serves not only as a controller for the feedback of acceleration fields, but also as a smart operator for the auto-tuning of the two cavities in the meantime, especially during the RF startup process to the full power. The details will be described in this report.
CEA is committed to the design, construction and commissioning of a Medium Energy Beam Transfer line and a superconducting linac (SCL) for SARAF accelerator in order to accelerate 5mA beam of either protons from 1.3 MeV to 35 MeV or deuterons from 2.
PAL-XFEL (Pohang Accelerator Laboratory X-ray Free Electron Laser) started RF conditioning in October 2015 and has been operating reliably for ~ 4 years. The machines LLRF and SSA systems contributed to the stable operation of PAL-XFEL with over 99%
The European Spallation Source (ESS) accelerator is composed of superconducting elliptical cavities. When the facility is running, the cavities are fed with electrical field from klystrons. Parameters of this field are monitored and controlled by the
Since its inception in the early 1980s, the SLC control system has been driven by a highly structured memory resident real-time database. While efficient, its rigid structure and file-based sources makes it difficult to maintain and extract relevant
The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the Joint-Project has been approved and recently started its construction at JAERI site at Tokai. The firs