ترغب بنشر مسار تعليمي؟ اضغط هنا

A Control System of the Joint-Project Accelerator Complex

89   0   0.0 ( 0 )
 نشر من قبل Junsei Chiba
 تاريخ النشر 2001
  مجال البحث فيزياء
والبحث باللغة English




اسأل ChatGPT حول البحث

The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the Joint-Project has been approved and recently started its construction at JAERI site at Tokai. The first beam commissioning is scheduled in 2006. In parallel with it, a 60-MeV Linac is now being constructed at KEK site at Tsukuba for R&D purpose. Recently the Project has officially decided to use the Experimental Physics and Industrial Control System (EPICS). Under the EPICS environment, we are challenging to implement the Ethernet/IP network for all communication, even at the level of end-point controllers which are so far connected via a field bus. In order to realize such a system, three new controllers (PLCs, WE7000 stations and general-purpose Ethernet boards) are being developed. A prototype EPICS driver for the PLCs works fine and is used to control the ion-source at the KEK Linac.



قيم البحث

اقرأ أيضاً

The Turkic Accelerator Complex (TAC) project has been developed with the support of the Turkish State Planning Organization by the collaboration of 10 Turkish universities. The complex is planned to have four main facilities, namely: SASE FEL Facilit y Based on 1 GeV Electron Linac, Third Generation Synchrotron Radiation Facility (SR) Based on 3.56 GeV Positron Synchrotron, Super-Charm Factory ($sqrt{s} = 3.77$ GeV) by colliding the electron beam coming from the linac with an energy of 1 GeV and positron beam coming through the positron ring with an energy of 3.56 GeV, GeV scale proton accelerator. Later has two-fold goal: Neutron Spallation Source (NSS) and ADS. The proton accelerator construction will have 3 MeV, 100 MeV, and 1 GeV phases. The technical design report is planned to be finished in 2013. Since Turkey has essential Thorium reserves the ADS becomes very attractive for our country as emerging energy technology.
Front end of a CW linac of the Project X contains an H source, an RFQ, a medium energy transport line with the beam chopper, and a SC low-beta linac that accelerates H- from 2.5 MeV to 160 MeV. SC Single Spoke Resonators (SSR) will be used in the lin ac, because Fermilab already successfully developed and tested a SSR for beta=0.21. Two manufactured cavities achieve 2.5 times more than design accelerating gradients. One of these cavities completely dressed, e.g. welded to helium vessel with integrated slow and fast tuners, and tested in CW regime. Successful tests of beta=0.21 SSR give us a confidence to use this type of cavity for low beta (0.117) and for high-beta (0.4) as well. Both types of these cavities are under development. In present report the basic constrains, parameters, electromagnetic and mechanical design for all the three SSR cavities, and first test results of beta=0.21 SSR are presented.
124 - T. Lahey , J. Rock , R. Sass 2001
Since its inception in the early 1980s, the SLC control system has been driven by a highly structured memory resident real-time database. While efficient, its rigid structure and file-based sources makes it difficult to maintain and extract relevant information. The goal of transforming the sources for this database into a relational form is to enable it to be part of a Control System Enterprise Database that is an integrated central repository for SLC accelerator device and control system data with links to other associated databases.
Recently, the Turkic Accelerator Complex (TAC) is proposed as a regional facility for accelerator based fundamental and applied research. The complex will include linac on ring type electron-positron collider as a phi, charm and tau factory, linac ba sed free electron laser (FEL), ring based third generation synchrotron radiation (SR) source and a few GeV proton accelerator. Preliminary estimations show that integral luminosity of hundred inverse femto-barns per year can be achieved for factory options. The FEL facility is planned to obtain laser beam between IR and soft X-ray region. In addition, SR facility will produce photon beams in UV and X-ray region. The proton accelerator will give opportunity to produce muon and neutron beams for applied research. The current status of the conceptual study of the complex is presented.
We report on updates to the accelerator controls for the Neutralized Drift Compression Experiment II, a pulsed induction-type accelerator for heavy ions. The control infrastructure is built around a LabVIEW interface combined with an Apache Cassandra backend for data archiving. Recent upgrades added the storing and retrieving of device settings into the database, as well as ZeroMQ as a message broker that replaces LabVIEWs shared variables. Converting to ZeroMQ also allows easy access via other programming languages, such as Python.
التعليقات
جاري جلب التعليقات جاري جلب التعليقات
سجل دخول لتتمكن من متابعة معايير البحث التي قمت باختيارها
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا