Waste resulting from construction operations affect the project, so that it adds financial values of the project, without leading to any improvement in it,or to improve the functional capabilities of the project, and lead to increased quantities required, thereby increasing the cost of the project and the accumulation of environmentally harmful solid waste. In this research, We will discuss the most important factors affecting the increase waste in the Syrian construction projects by identifying the most important causess that lead to an increase in waste materials, as well as identify the most important causes that lead to increased waste associated with design, storage or supervision. These factors will be arranged to determine the most effective on the project. At the end of the research we will formulated mathematical model to Optimize cutting of reinforced steel bars and Lindo program will be used to solve this model. It has been shown by the study that a large proportion of waste is resulting from random cutting bars.


Artificial intelligence review:
Research summary
تناقش الورقة البحثية للدكتور فايز علي جراد تأثير الهوالك الناتجة عن عمليات التشييد على مشاريع البناء في سوريا. تركز الدراسة على تحديد العوامل الرئيسية التي تؤدي إلى زيادة الهوالك في مواد البناء، مثل التصميم والتخزين والإشراف. تم استخدام استبيان لتحديد هذه العوامل وترتيبها حسب تأثيرها على المشروع. في نهاية البحث، تم صياغة نموذج رياضي لتحسين عملية قص قضبان حديد التسليح باستخدام برنامج Lindo، حيث تبين أن نسبة كبيرة من هوالك الحديد ناتجة عن عشوائية القص. توصلت الدراسة إلى أن التخزين العشوائي وعدم وجود مخططات تفصيلية من أهم أسباب الهوالك، وأوصت بوضع منهجيات صحيحة لإدارة الهوالك وتفعيل التشريعات المرتبطة بمراقبتها.
Critical review
تعتبر الدراسة خطوة مهمة نحو فهم وتحليل الهوالك في مشاريع التشييد السورية، إلا أنها تفتقر إلى بعض الجوانب التي يمكن أن تعزز من نتائجها. على سبيل المثال، كان من الممكن أن تكون الدراسة أكثر شمولية إذا تضمنت تحليلًا مقارنًا مع دول أخرى ذات ظروف مشابهة. كما أن الاعتماد على استبيان فقط قد لا يكون كافيًا للحصول على صورة دقيقة وشاملة عن المشكلة. كان من الممكن أيضًا تضمين دراسات حالة عملية لتوضيح كيفية تطبيق النموذج المقترح في الواقع. بالإضافة إلى ذلك، يجب أن تكون هناك توصيات واضحة ومحددة حول كيفية تنفيذ الحلول المقترحة على مستوى السياسات العامة.
Questions related to the research
  1. ما هي العوامل الرئيسية التي تؤدي إلى زيادة الهوالك في مشاريع التشييد السورية؟

    العوامل الرئيسية تشمل التصميم غير الدقيق، التخزين العشوائي، والإشراف غير الفعال.

  2. ما هو الهدف من استخدام النموذج الرياضي في الدراسة؟

    الهدف هو تحسين عملية قص قضبان حديد التسليح لتقليل الهوالك الناتجة عن العشوائية في القص.

  3. ما هي التوصيات التي قدمتها الدراسة لتقليل الهوالك؟

    التوصيات تشمل وضع منهجيات صحيحة لإدارة الهوالك، تفعيل التشريعات المرتبطة بمراقبتها، وتدريب الكوادر العاملة بشكل صحيح.

  4. كيف يمكن أن يؤثر التخزين العشوائي على الهوالك في مشاريع التشييد؟

    التخزين العشوائي يمكن أن يؤدي إلى تلف المواد وزيادة الهوالك بسبب عدم حماية المواد من العوامل الجوية وعدم تنظيمها بشكل صحيح.


References used
Edgar B. N. Optimization of Reinforced Steel Bar Estimates through Modified Bin Packing and Cutting Stock Algorithm for Computer-Aided Estimation,2015, www.academia.edu
Ehsan H., Material Waste Reduction between IBS and Conventional Construction, Journal of Mechanical and Civil Engineering, Aug 05, 2015,72-98
Murat K. , Gokhan E. , and Omer T. Life Cycle Assessment and Optimization- Based Decision Analysis of Construction Waste Recycling for a LEED-Certified University Building, 2016, www.mdpi.com/journal/sustainability
rate research

Read More

In line quenching and tempering has allowed ASCO (Arabian Steel Company) to have higher ductility bar at higher strength levels compared with classic rebar production with substantial reduction in alloy consumption by using heat treatment (thermex) during production proses on production line. QTB (Quenching Tempering Bars) is an alternate means of strengthening long bars by quenching the bars with water and then allowing the bars to self-tempering and hardened case, the process is performed in line with the rolling process, after the finishingarea. The process is stable and controlled, and it's effective on hardness and strength properties on reinforced steel bars The research has concentrate on Thermex and Thermex elements in finishing area of rolling process.
this study a questionnaire was implemented as a primary procedure for any methodology of risk management, and send out to the experts who work in the field of construction, in order to evaluate the reality of our projects as well as determine the serious problems, and all of this aim to form checklists including the major risks which the our projects are facing to be as a guide for early risks alert, to adopt the proper responses to deal with them.
The aim of this study is to develop a fuzzy inference model to estimate the impact of change orders on the duration of construction projects in Syria. This can help in obtaining the optimal estimation of the increasing of the project duration caus ed by the changes. The capability of gradient estimation of the fuzzy logic approach reduces the distrust of estimation using factor assessment. Also it estimates the duration of the project after any change.via the experts evaluation or according to the crisp logic.
Construction projects are subject to risks and uncertainties which affect project targets (cost, time, quality and safety). This paper reviews risks and their effects on construction projects in Syria, and it aims to develop risk management framew ork. In this work, risks in construction projects have been defined based on the literature review and interviews of some experts in the construction field. A questionnaire was designed to define the probability of risk occurrence and their effects, also to define the level of their effects by multiplying the probability occurrence with the effects. Another questionnaire was designed to define the extent of the effects of the most important risks on each target of the project, and to specify the procedures applied as a response to the risks. The results of this research revealed that "the Inflation, price changes" and "the difference between contracted quantities and actual quantities " are seen as the most important risk, where the studied risks in this work affect the schedule more than any other project targets. Also the results showed that avoiding the risks at the construction stage is the most used action.
In this research a study was carried out to evaluate the effect of adding random distribution plastic waste fiber inside soil on the geotechnical properties of clayey soil. The research is based on experimental method through many stages.