In our thesis, we present many previous approaches for mapping BPMN to BPEL. Moreover, we compare between their own strengths and weaknesses. Then we offer our new approach based on ESHUIS-GREFEN2 algorithm. We develop this algorithm to accept BPMN a
s input and BPEL as output. In addition, we solve the synchronization problem in ESHUIS algorithm by adding algorithm to find and process cross-synchronization links between parallel branches. We evaluated our approach by doing two case studies and comparing the results with other approaches and implementations.
خدمات ويب
Web Services
BPMN
مخطط إجرائية العمل
تمثيل رمزي لإجرائيات العمل
اللغة التنفيذية لإجرائيات العمل
تجميع الخدمات
الإجرائيات المهيكلة
الروابط المتزامنة
مخطط إجرائية العمل المبني بشكل جيد
Business process diagram
BPEL
composing services
structured process
synchronization dependencies
well-formed business process diagram
المزيد..
Three hundreds- Awassi yearlings, ١٨-١٩ months old, ٤٠ ± ١ kg weight,
٢,٥-٣ months post first lambing, were used to study the efficiency of hormonal
treatment in synchronizing estrus and increasing lambing rate with a program
of having two lambs p
er year. Ewes were randomly and equally divided into
three groups.