Do you want to publish a course? Click here

This study concentrates on two basic problems:i)- Increasing of power efficiency in Industrial premises to reduce the energy needed for product unit without any impact on the production level . To achieve this goal, lighting system should be opera ted in a certain condition, capacitor banks for power factor improvement should be installed, and energy losses of distribution transformers should be reduced.
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا