Do you want to publish a course? Click here

Poor productivity of construction workers is one of the causes of cost and time overruns in construction projects. Productivity plays an important role in the construction industry. Productivity is one of the most important issues in both developed and developing countries. This paper reports an investigation of the productivity problems in Syrian construction projects through a structured questionnaire survey. The main objective of this study is to determine and rank the factors that affecting labour productivity. 76 factors were identified through a detailed literature review and interview with projects managers. a questionnaire survey was designed and distributed to staff of various construction companies. The data obtained was analysed using the relative importance index. The results from the analysis revealed ten major factors affecting labour productivity in Syrian construction industry. These factors are: poor salary, material shortage, financial condition of contractor, poor safety instructions, size of workshop, rewards shortage, payment delay, low training, and low incentives.
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا