ﻻ يوجد ملخص باللغة العربية
The superconducting cavities in the continuous wave (CW) linacs of LCLS-II are designed to operate at 2 K, where cooling costs are very expensive. One source of heat is presented by the higher order mode (HOM) power deposited by the beam. Due to the very short bunch length--especially in L3 the final linac--the LCLS-II beam spectrum extends into the terahertz range. Ceramic absorbers, at 70 K and located between cryomodules, are meant to absorb much of this power. In this report we perform two kinds of calculations to estimate the effectiveness of the absorbers and the amount of beam power that needs to be removed at 2 K.
In LCLS-II, after acceleration and compression and just before entering the undulator, the beam passes through 2.5 km of 24.5 mm (radius) stainless steel pipe. The bunch that passes through the pipe is extremely short---with an rms of 8 um for the no
This paper describes the concept for the DArk Sector Experiments at LCLS-II (DASEL) facility which provides a near-CW beam of multi-GeV electrons to the SLAC End Station A for experiments in particle physics. The low-current multi-GeV electron beam i
In a partnership with SLAC National Accelerator Laboratory (SLAC) and Jefferson Lab, Fermilab will assemble and test 17 of the 35 total 1.3 GHz cryomodules for the Linac Coherent Light Source II (LCLS-II) Project. These include a prototype built and
Quality factor is a primary cost driver for high energy, continuous wave (CW) SRF linacs like the LCLS-II X-ray free electron laser currently under construction. Taking this into account, several innovations were introduced in the LCLS-II cryomodule
Field emission is one of the factors that can limit the performance of superconducting radio frequency cavities. In order to reduce possible field emission in LCLS-II (Linac Coherent Light Source II), we are developing plasma processing for 1.3 GHz 9