ترغب بنشر مسار تعليمي؟ اضغط هنا

The acceleration and storage of radioactive ions for a neutrino factory

88   0   0.0 ( 0 )
 نشر من قبل Mats Lindroos
 تاريخ النشر 2003
  مجال البحث فيزياء
والبحث باللغة English
 تأليف B. Autin




اسأل ChatGPT حول البحث

The term beta-beam has been coined for the production of a pure beam of electron neutrinos or their antiparticles through the decay of radioactive ions circulating in a storage ring. This concept requires radioactive ions to be accelerated to a Lorentz gamma of 150 for 6He and 60 for 18Ne. The neutrino source itself consists of a storage ring for this energy range, with long straight sections in line with the experiment(s). Such a decay ring does not exist at CERN today, nor does a high-intensity proton source for the production of the radioactive ions. Nevertheless, the existing CERN accelerator infrastructure could be used as this would still represent an important saving for a beta-beam facility. This paper outlines the first study, while some of the more speculative ideas will need further investigations.

قيم البحث

اقرأ أيضاً

A low-energy Muon Collider (MC) offers unique opportunities to study the recently found Higgs boson. However, due to a relatively large beam emittance with moderate cooling in this machine, large-aperture high- field superconducting (SC) magnets are required. The magnets need also an adequate margin to operate at a large radiation load from the muon decay showers. General specifications of the SC dipoles and quadrupoles for the 125 GeV c.o.m. Higgs Factory with an average luminosity of ~2x10**31 cm-2s-1 are formulated. Magnet conceptual designs and parameters are reported. The impact of the magnet fringe fields on the beam dynamics as well as the IR and lattice magnet protection from radiation are also reported and discussed.
296 - David Neuffer 2017
A neutrino factory or muon collider requires the capture and cooling of a large number of muons. Scenarios for capture, bunching, phase-energy rotation and initial cooling of {mu}s produced from a proton source target have been developed, initially f or neutrino factory scenarios. They require a drift section from the target, a bunching section and a {phi}-{delta}E rotation section leading into the cooling channel. Important concerns are rf limitations within the focusing magnetic fields and large losses in the transport. The currently preferred cooling channel design is an HFOFO Snake configuration that cools both {mu}+ and {mu}- transversely and longitudinally. The status of the design is presented and variations are discussed.
The long-term prospects for fully exploring three-flavor mixing in the neutrino sector depend upon an ongoing and increased investment in the appropriate accelerator R&D. Two new concepts have been proposed that would revolutionize neutrino experimen ts, namely the Neutrino Factory and the Beta Beam facility. These new facilities would dramatically improve our ability to test the three-flavor mixing framework, measure textsl{CP} violation in the lepton sector, and perhaps determine the neutrino mass hierarchy, and, if necessary, probe extremely small values of the mixing angle $theta_{13}$. The stunning sensitivity that could be achieved with a Neutrino Factory is described, together with our present understanding of the corresponding sensitivity that might be achieved with a Beta Beam facility. In the Beta Beam case, additional study is required to better understand the optimum Beta Beam energy, and the achievable sensitivity. Neither a Neutrino Factory nor a Beta Beam facility could be built without significant R&D. An impressive Neutrino Factory R&D effort has been ongoing in the U.S. and elsewhere over the last few years and significant progress has been made towards optimizing the design, developing and testing the required accelerator components, and significantly reducing the cost. The recent progress is described here.
126 - J-P. Delahaye 2018
A Neutrino Factory where neutrinos of all species are produced in equal quantities by muon decay is described as a facility at the intensity frontier for exquisite precision providing ideal conditions for ultimate neutrino studies and the ideal compl ement to Long Baseline Facilities like LBNF at Fermilab. It is foreseen to be built in stages with progressively increasing complexity and performance, taking advantage of existing or proposed facilities at an existing laboratory like Fermilab. A tentative layout based on a recirculating linac providing opportunities for considerable saving is discussed as well as its possible evolution toward a muon collider if and when requested by Physics. Tentative parameters of the various stages are presented as well as the necessary R&D to address the technological issues and demonstrate their feasibility.
206 - D. Neuffer 2012
We discuss the design of the muon capture front end of the neutrino factory International Design Study. In the front end, a proton bunch on a target creates secondary pions that drift into a capture transport channel, decaying into muons. A sequence of rf cavities forms the resulting muon beams into strings of bunches of differing energies, aligns the bunches to (nearly) equal central energies, and initiates ionization cooling. The muons are then accelerated to high energy where their decays provide neutrino beams. For the International Design Study (IDS), a baseline design must be developed and optimized for an engineering and cost study. We present a baseline design that can be used to establish the scope of a future neutrino Factory facility.
التعليقات
جاري جلب التعليقات جاري جلب التعليقات
سجل دخول لتتمكن من متابعة معايير البحث التي قمت باختيارها
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا