We discuss the design of the muon capture front end of the neutrino factory International Design Study. In the front end, a proton bunch on a target creates secondary pions that drift into a capture transport channel, decaying into muons. A sequence of rf cavities forms the resulting muon beams into strings of bunches of differing energies, aligns the bunches to (nearly) equal central energies, and initiates ionization cooling. The muons are then accelerated to high energy where their decays provide neutrino beams. For the International Design Study (IDS), a baseline design must be developed and optimized for an engineering and cost study. We present a baseline design that can be used to establish the scope of a future neutrino Factory facility.
A neutrino factory or muon collider requires the capture and cooling of a large number of muons. Scenarios for capture, bunching, phase-energy rotation and initial cooling of {mu}s produced from a proton source target have been developed, initially f
The (International Design Report) IDR neutrino factory scenario for capture, bunching, phase-energy rotation and initial cooling of micros produced from a proton source target is explored. It requires a drift section from the target, a bunching secti
We present a quantitative appraisal of the physics potential for neutrino experiments at the front-end of a muon storage ring. We estimate the forseeable accuracy in the determination of several interesting observables, and explore the consequences o
A neutrino factory or muon collider requires the capture and cooling of a large number of muons. Scenarios for capture, bunching, phase-energy rotation and initial cooling of {mu}s produced from a proton source target have been developed, for neutrin
A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilabs injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm