ترغب بنشر مسار تعليمي؟ اضغط هنا

151 - K. Bane , T. Raubenheimer 2014
In LCLS-II, after acceleration and compression and just before entering the undulator, the beam passes through 2.5 km of 24.5 mm (radius) stainless steel pipe. The bunch that passes through the pipe is extremely short---with an rms of 8 um for the no minal 100 pC case. Thus, even though the pipe has a large aperture, the wake that applies is the {it short-range} resistive wall wakefield. The bunch distribution is approximately uniform, and therefore the wake induced voltage is characterized by a rather linear voltage chirp. It turns out that the wake supplies needed dechirping to the LCLS-II beam before it enters the undulator. In this note we calculate the wake, discuss the confidence in the calculation, and investigate how to improve the induced chirp linearity and/or strength. Finally, we also study the strength and effects of the transverse (dipole) resistive wall wakefield.
170 - K. Bane 2014
The superconducting cavities in the continuous wave (CW) linacs of LCLS-II are designed to operate at 2 K, where cooling costs are very expensive. One source of heat is presented by the higher order mode (HOM) power deposited by the beam. Due to the very short bunch length--especially in L3 the final linac--the LCLS-II beam spectrum extends into the terahertz range. Ceramic absorbers, at 70 K and located between cryomodules, are meant to absorb much of this power. In this report we perform two kinds of calculations to estimate the effectiveness of the absorbers and the amount of beam power that needs to be removed at 2 K.
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا