Do you want to publish a course? Click here

The D0 Run II Trigger System

66   0   0.0 ( 0 )
 Publication date 2004
  fields Physics
and research's language is English




Ask ChatGPT about the research

I present the current status of the D0 trigger system in Run II at the Tevatron.



rate research

Read More

66 - T. Adams , Q. An , K.M. Black 2007
Many physics topics to be studied by the D0 experiment during Run II of the Fermilab Tevatron ppbar collider give rise to final states containing b--flavored particles. Examples include Higgs searches, top quark production and decay studies, and full reconstruction of B decays. The sensitivity to such modes has been significantly enhanced by the installation of a silicon based vertex detector as part of the DO detector upgrade for Run II. Interesting events must be identified initially in 100-200 microseconds to be available for later study. This paper describes custom electronics used in the DO trigger system to provide the real--time identification of events having tracks consistent with the decay of b--flavored particles.
344 - M. Krivda , D. Evans , K.L. Graham 2017
The ALICE Central Trigger Processor (CTP) is going to be upgraded for LHC Run 3 with completely new hardware and a new Trigger and Timing Control (TTC-PON) system based on a Passive Optical Network (PON) system. The new trigger system has been designed as dead time free and able to transmit trigger data at 9.6 Gbps. A new universal trigger board has been designed, where by changing the FMC card, it can function as a CTP or as a LTU. It is based on the Xilinx Kintex Ultrascale FPGA and upgraded TTC-PON. The new trigger system and the prototype of the trigger board will be presented.
The performance of the D0 experiment forward muon scintillation counters system during Run II of the Tevatron from 2001 to 2011 is described. The system consists of 4214 scintillation counters in six layers. The long term stability of the counters amplitude response determined using LED calibration system and muons produced in proton-antiproton collisions is presented. The average signal amplitude for counters of all layers has gradually decreased over ten years by 11%. The reference timing, determined using LED calibration, was stable within 0.26 ns. Average value of muon timing peak position was used for periodic D0 clock signal adjustments to compensate seasonal drift caused by temperature variations. Counters occupancy for different triggers in physics data collection runs and for minimum bias triggers are presented. The single muon yields versus time and the luminosity dependence of yields were stable for the forward muon system within 1% over 10 years.
127 - C.-H. Kim , Y. Unno , B.G. Cheon 2020
The Belle II experiment at the SuperKEKB $e^{+}e^{-}$ collider in KEK, Japan, started physics data-taking with a complete detector from early 2019 with the primary physics goal of probing new physics in heavy quark and lepton decays. An online trigger system is indispensable for the Belle II experiment to reduce the beam background events associated with high electron and positron beam currents without sacrificing the target physics-oriented events. During the Belle II operation upon beam collision, the trigger system must be consistently controlled and its status must be carefully monitored in the process of data acquisition against unexpected situations. For this purpose, we have developed a slow control system for the Belle II trigger system. Around seventy thousand configuration parameters are saved in the Belle II central database server for every run when a run starts and stops. These parameters play an essential role in offline validation of the quality of runs. Around three thousand real-time variables are stored in the Belle II main archiving server, and the trend of some of these variables are regularly used for online and offline monitoring purposes. Various operator interface tools have been prepared and used. When the configuration parameters are not correctly applied, or some of the processes are unexpectedly terminated, the slow control system detects it, stops the data-taking process, and generates an alarm. In this article, we report how we constructed the Belle II trigger slow control system, and how we successfully managed to operate during its initial stage.
70 - C.H. Kim , S.H. Kim , I.S. Lee 2018
The Belle II experiment at the SuperKEKB e+e- collider in KEK, Japan does start physics data-taking from early of 2018 with primary physics goal that is to probe the New Physics effect using heavy quark and lepton weak decays. During trigger and DAQ operation upon beam collision, it is important that Belle II detector (Fig. 1) status have to be monitored in a process of data-taking against an unexpected situation. Slow control system, built in the Control System Studio (CSS) which is a GUI window design tool based on Eclipse, is one of monitoring and controlling systems in Belle II operation. Database and archiver servers are connected to slow control system. Experimental parameters are downloaded to Belle II main database server which is based on PostgreSQL. Real-time results are stored in archiver server which is based on EPICS (The Experimental Physics and Industrial Control System) archiver appliances and tomcat which is open-source java servlet container. In this study, we report the development of slow control system for the Belle II electromagnetic calorimeter (ECL) trigger system.
comments
Fetching comments Fetching comments
Sign in to be able to follow your search criteria
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا