Do you want to publish a course? Click here

This research aims to decrease the cost of last production stages through decreasing the cost of potential casing repair by avoiding the problems that casing string may be exposed to. Such problems are caused by the temperature effect of salt dril ling fluids as well as other fluids normally existed in the annular behind casing at the nonecemented intervals.
This research aims to increase the production lifetime of oil and gas wells through avoiding the problems that production casing string may be exposed to. Such problems are caused by the effect of different drilling fluids as well as other fluids normally existed in the annular behind casing at the none-cemented intervals.
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا