ترغب بنشر مسار تعليمي؟ اضغط هنا

In Orbit Timing Calibration of the Hard X-Ray Detector on Board Suzaku

147   0   0.0 ( 0 )
 نشر من قبل Yukikatsu Terada
 تاريخ النشر 2007
  مجال البحث فيزياء
والبحث باللغة English
 تأليف Yukikatsu Terada




اسأل ChatGPT حول البحث

The hard X-ray detector (HXD) on board the X-ray satellite Suzaku is designed to have a good timing capability with a 61 $mu$s time resolution. In addition to detailed descriptions of the HXD timing system, results of in-orbit timing calibration and performance of the HXD are summarized. The relative accuracy of time measurements of the HXD event was confirmed to have an accuracy of $1.9times 10^{-9}$ s s$^{-1}$ per day, and the absolute timing was confirmed to be accurate to 360 $mu$s or better. The results were achieved mainly through observations of the Crab pulsar, including simultaneous ones with RXTE, INTEGRAL, and Swift.



قيم البحث

اقرأ أيضاً

The in-orbit performance and calibration of the Hard X-ray Detector (HXD) on board the X-ray astronomy satellite Suzaku are described. Its basic performances, including a wide energy bandpass of 10-600 keV, energy resolutions of ~4 keV (FWHM) at 40 k eV and ~11% at 511 keV, and a high background rejection efficiency, have been confirmed by extensive in-orbit calibrations. The long-term gains of PIN-Si diodes have been stable within 1% for half a year, and those of scintillators have decreased by 5-20%. The residual non-X-ray background of the HXD is the lowest among past non-imaging hard X-ray instruments in energy ranges of 15-70 and 150-500 keV. We provide accurate calibrations of energy responses, angular responses, timing accuracy of the HXD, and relative normalizations to the X-ray CCD cameras using multiple observations of the Crab Nebula.
62 - T. Takahashi , K. Abe , M. Endo 2006
The Hard X-ray Detector (HXD) on board Suzaku covers a wide energy range from 10 keV to 600 keV by combination of silicon PIN diodes and GSO scintillators. The HXD is designed to achieve an extremely low in-orbit back ground based on a combination of new techniques, including the concept of well-type active shield counter. With an effective area of 142 cm^2 at 20 keV and 273 cm2 at 150 keV, the background level at the sea level reached ~1x10^{-5} cts s^{-1} cm^{-2} keV^{-1} at 30 keV for the PI N diodes, and ~2x10^{-5} cts s^{-1} cm^{-2} keV^{-1} at 100 keV, and ~7x10^{-6} cts s^{-1} cm^{-2} keV^{-1} at 200 keV for the phoswich counter. Tight active shielding of the HXD results in a large array of guard counters surrounding the main detector parts. These anti-coincidence counters, made of ~4 cm thick BGO crystals, have a large effective area for sub-MeV to MeV gamma-rays. They work as an excellent gamma-ray burst monitor with limited angular resolution (~5 degree). The on-board signal-processing system and the data transmitted to the ground are also described.
146 - Youli Tuo , Xiaobo Li , Mingyu Ge 2021
We present the timing system and the performances of the three payloads onboard the Insight-Hard X-ray Modulation Telescope (Insight-HXMT). Insight-HXMT carries three main payloads onboard: the High Energy X-ray telescope (HE, 20-250 keV), the Medium Energy X-ray telescope (ME, 5-30 keV) and the low Energy X-ray telescope (LE, 1-10 keV). We have reported the results of time-cumulative pulse profiles and period evolution using long-term monitoring data of the Crab pulsar. To compare the measurement of the time of arrivals (ToAs) on Crab pulsar, we use the quasi-simultaneous Crab observation with the X-ray Timing Instrument (XTI) on-board the Neutron star Interior Composition Explorer (NICER). The systematic errors of the timing system are determined to be 12.1 {mu}s, 8.6 {mu}s, and 15.8 {mu}s for HE, ME and LE respectively. The timing offsets are delayed with respect to NICER about 24.7 {mu}s, 10.1 {mu}s and 864.7 {mu}s for HE, ME and LE respectively.
Improvements of in-orbit calibration of GSO scintillators in the Hard X-ray Detector on board Suzaku are reported. To resolve an apparent change of the energy scale of GSO which appeared across the launch for unknown reasons, consistent and thorough re-analyses of both pre-launch and in-orbit data have been performed. With laboratory experiments using spare hardware, the pulse height offset, corresponding to zero energy input, was found to change by ~0.5 of the full analog voltage scale, depending on the power supply. Furthermore, by carefully calculating all the light outputs of secondaries from activation lines used in the in-orbit gain determination, their energy deposits in GSO were found to be effectively lower, by several percent, than their nominal energies. Taking both these effects into account, the in-orbit data agrees with the on-ground measurements within ~5%, without employing the artificial correction introduced in the previous work (Kokubun et al. 2007). With this knowledge, we updated the data processing, the response, and the auxiliary files of GSO, and reproduced the HXD-PIN and HXD-GSO spectra of the Crab Nebula over 12-300 keV by a broken powerlaw with a break energy of ~110 keV.
168 - Matteo Bachetti 2020
The Nuclear Spectroscopic Telescope Array (NuSTAR) mission is the first focusing X-ray telescope in the hard X-ray (3-79 keV) band. Among the phenomena that can be studied in this energy band, some require high time resolution and stability: rotation -powered and accreting millisecond pulsars, fast variability from black holes and neutron stars, X-ray bursts, and more. Moreover, a good alignment of the timestamps of X-ray photons to UTC is key for multi-instrument studies of fast astrophysical processes. In this Paper, we describe the timing calibration of the NuSTAR mission. In particular, we present a method to correct the temperature-dependent frequency response of the on-board temperature-compensated crystal oscillator. Together with measurements of the spacecraft clock offsets obtained during downlinks passes, this allows a precise characterization of the behavior of the oscillator. The calibrated NuSTAR event timestamps for a typical observation are shown to be accurate to a precision of ~65 microsec.
التعليقات
جاري جلب التعليقات جاري جلب التعليقات
سجل دخول لتتمكن من متابعة معايير البحث التي قمت باختيارها
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا