ترغب بنشر مسار تعليمي؟ اضغط هنا

Upgrading of the beam diagnostic system of U-70 beam transfer lines

68   0   0.0 ( 0 )
 نشر من قبل Alexander Loukiantsev
 تاريخ النشر 2001
  مجال البحث فيزياء
والبحث باللغة English
 تأليف V. Kovaltsov




اسأل ChatGPT حول البحث

The beam diagnostic system of U-70 beam transfer lines (beam profiles, intensity and beam losses measurements) was designed in the beginning of 80-th on the base of 8-bit microprocessor, SUMMA hardware and home made serial communication link. Because of the maintenance problems the decision was taken to upgrade the hardware and software parts of the system.

قيم البحث

اقرأ أيضاً

A VME-based data acquisition system for beam-loss monitors has been developed and is in use in the Tevatron and Main Injector accelerators at the Fermilab complex. The need for enhanced beam-loss protection when the Tevatron is operating in collider- mode was the main driving force for the new design. Prior to the implementation of the present system, the beam-loss monitor system was disabled during collider operation and protection of the Tevatron magnets relied on the quench protection system. The new Beam-Loss Monitor system allows appropriate abort logic and thresholds to be set over the full set of collider operating conditions. The system also records a history of beam-loss data prior to a beam-abort event for post-abort analysis. Installation of the Main Injector system occurred in the fall of 2006 and the Tevatron system in the summer of 2007. Both systems were fully operation by the summer of 2008. In this paper we report on the overall system design, provide a description of its normal operation, and show a number of examples of its use in both the Main Injector and Tevatron.
CERN has launched a study phase to evaluate the feasibility of a new high-intensity beam dump facility at the CERN Super Proton Synchrotron accelerator with the primary goal of exploring Hidden Sector models and searching for Light Dark Matter, but w hich also offers opportunities for other fixed target flavour physics programs such as rare tau lepton decays and tau neutrino studies. The new facility will require - among other infrastructure - a target complex in which a dense target/dump will be installed, capable of absorbing the entire energy of the beam extracted from the SPS accelerator. In theory, the target/dump could produce very weakly interacting particles, to be investigated by a suite of particle detectors to be located downstream of the target complex. As part of the study, a development design of the target complex has been produced, taking into account the handling and remote handling operations needed through the lifetime of the facility. Two different handling concepts have been studied and both resulting designs are presented.
113 - P. Klag , P. Achenbach , M. Biroth 2018
A novel interferometric method for absolute beam energy measurement is under development at MAMI. At the moment, the method is tested and optimized at an energy of 195 MeV. Despite the very small statistical uncertainty of the method, systematic effe cts have limited the overall accuracy. Recently, a measurement has been performed dedicated to the evaluation of these effects. This report comprises a description of the method and results of the recent data taking period.
63 - W. Guo , W. Xu , J.G. Chen 2006
Shanghai Laser Electron Gamma Source, a $gamma$-ray beam line of 10MeV order was proposed recently. The beam line is expected to generate $gamma$-ray with maximum energy of 22MeV by backward Compton scattering between CO$_2$ laser and electron in the 3.5GeV storage ring of future Shanghai Synchrotron Radiation Facility. The flux of non-collimated $gamma$-ray can be 10$^9$ $sim$ 10$^{10}$s$^{-1}$ if a commercial CO$_2$ laser of 100W order output power is employed and injected with optimized settings.
106 - F. Marti , R.C. York , H. Blosser 1999
The creation of intense radioactive beams requires intense and energetic primary beams. A task force analysis of this subject recommended an acceleration system capable of 400 MeV/u uranium at 1 particle uA as an appropriate driver for such a facilit y. The driver system should be capable of accelerating lighter ions at higher intensity such that a constant final beam power (~100kW) is maintained. This document is a more detailed follow on to the previous analysis of such a system incorporating a cyclotron. The proposed driver pre-acceleration system consists of an ion source, radio frequency quadrupole, and linac chain capable of producing a final energy of 30 MeV/u and a charge (Q) to mass (A) of Q/A ~1/3. This acceleration system would be followed by a Separated Sector Cyclotron with a final output energy of 400 MeV/u. This system provides a more cost-effective solution in terms of initial capital investment as well as of operation compared to a fully linac system with the same primary beam output parameters.
التعليقات
جاري جلب التعليقات جاري جلب التعليقات
سجل دخول لتتمكن من متابعة معايير البحث التي قمت باختيارها
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا