ترغب بنشر مسار تعليمي؟ اضغط هنا

Tests of the CERN Proton Linac Performance for LHC-Type Beams

336   0   0.0 ( 0 )
 نشر من قبل Richard Scrivens
 تاريخ النشر 2000
  مجال البحث فيزياء
والبحث باللغة English
 تأليف C.E. Hill




اسأل ChatGPT حول البحث

As the pre-injector of the LHC injector chain, the proton linac at CERN is required to provide a high-intensity (180mA) beam to the Proton Synchrotron Booster. The results of measurements at this intensity will be presented. Furthermore, the linac is now equipped with bunch shape monitors from INR, Moscow, which have allowed the comparison of the Alvarez tank RF settings with simulations.



قيم البحث

اقرأ أيضاً

72 - R. Akre , V. Bharadwaj , P. Emma 2000
The Linac Coherent Light Source (LCLS) project at SLAC uses a dense 15 GeV electron beam passing through a long undulator to generate extremely bright x-rays at 1.5 angstroms. The project requires electron bunches with a nominal peak current of 3.5kA and bunch lengths of 0.020mm (70fs). The bunch compression techniques used to achieve the high brightness impose challenging tolerances on the accelerator RF phase and amplitude. The results of measurements on the existing SLAC linac RF phase and amplitude stability are summarised and improvements needed to meet the LCLS tolerances are discussed.
246 - A. Saini , K. Ranjan , N. Solyak 2012
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. Its Superconducting Linac, to be used at first stage of acceleration, will be operated in continuous wave (CW) mode. The Linac is divided into three sections on the basis of operating frequencies & six sections on the basis of family of RF cavities to be used for the acceleration of beam from 2.5 MeV to 3 GeV. The transition from one section to another can limit the acceptance of the Linac if these are not matched properly. We performed a study to calculate the acceptance of the Linac in both longitudinal and transverse plane. Investigation of most sensitive area which limits longitudinal acceptance and study of influence of failure of beam line elements at critical position, on acceptance are also performed.
322 - M. Vretenar 2000
In view of a possible evolution of the CERN accelerator complex towards higher proton intensities, a 2.2 GeV H- linac with 4 MW beam power has been designed, for use in connection with an accumulator and compressor ring as proton driver of a muon-bas ed Neutrino Factory. The high-energy part of this linac can use most of the RF equipment (superconducting cavities and klystrons) from the LEP collider after its decommissioning at the end of 2000. Recent results concerning low-beta superconducting cavities are presented, and the main characteristics of the linac design are described. The complete linac-based proton driver facility is outlined, and the impact on the linac design of the requirements specific to a Neutrino Factory is underlined.
92 - G. Iadarola 2013
Several indicators have pointed to the presence of an Electron Cloud (EC) in some of the CERN accelerators, when operating with closely spaced bunched beams. In particular, spurious signals on the pick ups used for beam detection, pressure rise and b eam instabilities were observed at the Proton Synchrotron (PS) during the last stage of preparation of the beams for the Large Hadron Collider (LHC), as well as at the Super Proton Synchrotron (SPS). Since the LHC has started operation in 2009, typical electron cloud phenomena have appeared also in this machine, when running with trains of closely packed bunches (i.e. with spacings below 150ns). Beside the above mentioned indicators, other typical signatures were seen in this machine (due to its operation mode and/or more refined detection possibilities), like heat load in the cold dipoles, bunch dependent emittance growth and degraded lifetime in store and bunch-by-bunch stable phase shift to compensate for the energy loss due to the electron cloud. An overview of the electron cloud status in the different CERN machines (PS, SPS, LHC) will be presented in this paper, with a special emphasis on the dangers for future operation with more intense beams and the necessary countermeasures to mitigate or suppress the effect.
295 - Zheng Gao , Yuan He , Xian-Wu Wang 2016
Significant transient beam loading effects were observed during beam commissioning tests of prototype II of the injector for the Accelerator Driven Sub-critical (ADS) system, which took place at the Institute of Modern Physics, Chinese Academy of Sci ences, between October and December 2014. During these tests experiments were performed with CW operation of the cavities with pulsed beam current, and the system was configured to make use of a prototype digital low level radio frequency (LLRF) controller. The system was originally operated in pulsed mode with a simple PID feedback control algorithm, which was not able to maintain the desired gradient regulation during pulsed 10 mA beam operations. A unique simple transient beam loading compensation method which made use of a combination of PI feedback and feedforward control algorithm was implemented in order to significantly reduce the beam induced transient effect in the cavity gradients. The superconducting cavity field variation was reduced to less than 1.7% after turning on this control algorithm. The design and experimental results of this system are presented in this paper.
التعليقات
جاري جلب التعليقات جاري جلب التعليقات
سجل دخول لتتمكن من متابعة معايير البحث التي قمت باختيارها
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا