ﻻ يوجد ملخص باللغة العربية
The Neutrinos Angra Experiment has completed a major step by finishing the comissioning of the detector and the data acquisition system at the experimental site located in the Angra dos Reis nuclear power plant. The experiment consists of a water-based detector and associated electronics, both designed with the goal of detecting the electron antineutrinos produced by the nuclear reactor. The detection is possible due to the Inverse Beta Decay, where the final products in the water are photons in the UV-to-visible range of the spectrum. The assembled detector comprises three active volumes filled with water: (i) a cubic target detector for electron antineutrinos, covered by 32 8-inches PMTs, (ii) a lateral layer surrounding the target (veto) equipped with 4 PMTs and (iii) a third volume covering the top of both, also equipped with 4~PMTs. In the present document the main features of the detector assembly as well as the integration of the readout electronics on-site are reported. Finally, some operational characteristics are shown based on straightforward analysis of the first measurements performed during the last months with the fully working detector.
The v-Angra experiment aims to estimate the flux of antineutrino particles coming out from the Angra II nuclear reactor. Such flux is proportional to the thermal power released in the fission process and therefore can be used to infer the quantity of
The KArlsruhe TRItium Neutrino (KATRIN) experiment, which aims to make a direct and model-independent determination of the absolute neutrino mass scale, is a complex experiment with many components. More than 15 years ago, we published a technical de
The Argon Dark Matter experiment is a ton-scale double phase argon Time Projection Chamber designed for direct Dark Matter searches. It combines the detection of scintillation light together with the ionisation charge in order to discriminate the bac
The Timing Counter of the MEG (Mu to Electron Gamma) experiment is designed to deliver trigger information and to accurately measure the timing of the $e^+$ in searching for the decay $mu^+ rightarrow e^+gamma$. It is part of a magnetic spectrometer
A magnetic horn system to be operated at a pulsed current of 320 kA and to survive high-power proton beam operation at 750 kW was developed for the T2K experiment. The first set of T2K magnetic horns was operated for over 12 million pulses during the