ترغب بنشر مسار تعليمي؟ اضغط هنا

2013 Update of the discoveries of nuclides

308   0   0.0 ( 0 )
 نشر من قبل Michael Thoennessen
 تاريخ النشر 2014
  مجال البحث
والبحث باللغة English
 تأليف M. Thoennessen




اسأل ChatGPT حول البحث

The 2013 update of the discovery of nuclide project is presented. Details of the 12 new nuclides observed for the first time in 2013 are described. In addition, the discovery of 266Db has been included and the previous assignments of 6 other nuclides were changed. Overview tables of where and how nuclides were discovered have also been updated and are discussed.



قيم البحث

اقرأ أيضاً

The 2018 update of the discovery of nuclide project is presented. 50 new nuclides were observed for the first time in 2018. A large number of isotopes is still only published in conference proceedings or internal reports.
121 - M. Thoennessen 2015
The 2014 update of the discovery of nuclide project is presented. Only six new nuclides were observed for the first time in 2014 while the assignments of seventeen other nuclides were revised. In addition, for another fourteen nuclides the laboratories where they were discovered were reassigned.
100 - M. Thoennessen 2018
The 2017 update of the discovery of nuclide project is presented. 34 new nuclides were observed for the first time in 2017. However, the assignment of six previously identified nuclides had to be retracted.
118 - M. Thoennessen 2017
The 2016 update of the discovery of nuclide project is presented. Only twelve new nuclides were observed for the first time in 2016. A large number of isotopes is still only published in conference proceedings or internal reports. No changes to earlier assignments were made.
50 - M. Thoennessen 2016
The 2015 update of the discovery of nuclide project is presented. Twenty new nuclides were observed for the first time in 2015. An overall review of all previous assignments was made in order to apply the discovery criteria consistently to all elemen ts. In addition, a list of isotopes published so far only in conference proceedings or internal reports is included.
التعليقات
جاري جلب التعليقات جاري جلب التعليقات
سجل دخول لتتمكن من متابعة معايير البحث التي قمت باختيارها
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا