ﻻ يوجد ملخص باللغة العربية
A method to estimate efficiency of event start time determination at BESIII is developed. This method estimates the efficiency at the event level by combining the efficiencies of various tracks ($e$, $mu$, $pi$, K, $p$, $gamma$) in a Bayesian way. Efficiencies results and difference between data and MC at the track level are presented in this paper. For a given physics channel, event start time efficiency and systematic error can be estimated following this method.
The results of a full simulation of an endcap Time-of-Flight detector upgrade based on multigap resistive plate chambers for the BESIII experiment are presented. The simulation and reconstruction software is based on Geant4 and has been implemented i
BESIII is a currently running tau-charm factory with the largest samples of on threshold charm meson pairs, directly produced charmonia and some other unique datasets at BEPCII collider. Machine learning techniques have been employed to improve the p
Simulations of photon propagation in scintillation detectors were performed with the aim to find the optimal scintillator geometry, surface treatment, and shape of external reflector in order to achieve maximum light collection efficiency for detecto
A GEANT4-based simulation is developed for the endcap time of flight (ETOF) upgrade based on multi-gap resistive plate chambers (MRPC) for the BESIII experiment. The MRPC prototype and the simulation method are described. Using a full Monte-Carlo sim
The upgrade of the current BESIII Endcap TOF (ETOF) is carried out with the Multi-gap Resistive Plate Chamber (MRPC) technology. The installation of the new ETOF has been finished in October 2015. The first results of the MRPCs commissioning at BESIII are reported in this paper.