ترغب بنشر مسار تعليمي؟ اضغط هنا

We developed and compared Constraint Programming (CP) and Quantum Annealing (QA) approaches for rolling stock optimisation considering necessary maintenance tasks. To deal with such problems in CP we investigated specialised pruning rules and impleme nted them in a global constraint. For the QA approach, we developed quadratic unconstrained binary optimisation (QUBO) models. For testing, we use data sets based on real data from Deutsche Bahn and run the QA approach on real quantum computers from D-Wave. Classical computers are used to run the CP approach as well as tabu search for the QUBO models. We find that both approaches tend at the current development stage of the physical quantum annealers to produce comparable results, with the caveat that QUBO does not always guarantee that the maintenance constraints hold, which we fix by adjusting the QUBO model in preprocessing, based on how close the trains are to a maintenance threshold distance.
The subject of Job Scheduling Optimisation (JSO) deals with the scheduling of jobs in an organization, so that the single working steps are optimally organized regarding the postulated targets. In this paper a use case is provided which deals with a sub-aspect of JSO, the Job Shop Scheduling Problem (JSSP or JSP). As many optimization problems JSSP is NP-complete, which means the complexity increases with every node in the system exponentially. The goal of the use case is to show how to create an optimized duty rooster for certain workpieces in a flexible organized machinery, combined with an Autonomous Ground Vehicle (AGV), using Constraint Programming (CP) and Quantum Computing (QC) alternatively. The results of a classical solution based on CP and on a Quantum Annealing model are presented and discussed. All presented results have been elaborated in the research project PlanQK.
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا