No Arabic abstract
An 805 MHz RF pillbox cavity has been designed and constructed to investigate potential muon beam acceleration and cooling techniques for a Muon Collider or Neutrino Factory. The cavity can operate in vacuum or under pressure to 100 atmospheres, at room temperature or in a liquid nitrogen bath at 77 K. The cavity has been designed for easy assembly and disassembly with bolted construction using aluminum seals. To perform vacuum and high pressure breakdown studies of materials and geometries most suitable for the collider or factory, the surfaces of the end walls of the cavity can be replaced with different materials such as copper, aluminum, beryllium, or molybdenum, and with different geometries such as shaped windows or grid structures. The cavity has been designed to fit inside the 5-Tesla solenoid in the MuCool Test Area at Fermilab. In this paper we present the vacuum conditioning results and discuss plans for testing in a 5-Tesla magnetic field. Additionally, we discuss the testing plan for beryllium (a material research has shown to be ideal for the collider or factory) end walls.
The paper discusses future experiments at super $B$ factories. It presents the physics motivation and the tools, accelerators and detectors, and reviews the status of the two projects, SuperKEKB/Belle-II in Japan and SuperB in Italy.
Muons have been accelerated by using a radio frequency accelerator for the first time. Negative muonium atoms (Mu$^-$), which are bound states of positive muons ($mu^+$) and two electrons, are generated from $mu^+$s through the electron capture process in an aluminum degrader. The generated Mu$^-$s are initially electrostatically accelerated and injected into a radio frequency quadrupole linac (RFQ). In the RFQ, the Mu$^-$s are accelerated to 89 keV. The accelerated Mu$^-$s are identified by momentum measurement and time of flight. This compact muon linac opens the door to various muon accelerator applications including particle physics measurements and the construction of a transmission muon microscope.
The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beamlines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating a 750-MeV electron beam with ILC beam intensity. An expansion of this facility was recently completed that will provide the capability to upgrade the accelerator to a total beam energy of 1.5-GeV. Two new buildings were also constructed adjacent to the ASTA facility to house a new cryogenic plant and multiple superconducting RF (SRF) cryomodule test stands. In addition to testing accelerator components, this facility will be used to test RF power systems, instrumentation, and control systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.
PARS (Plasma Acceleration Research Station) is an electron beam driven plasma wakefield acceleration test stand proposed for VELA/CLARA facility in Daresbury Laboratory. In order to optimise various operational configurations, 2D numerical studies were performed by using VSIM for a range of parameters such as bunch length, radius, plasma density and positioning of the bunches with respect to each other for the two-beam acceleration scheme. In this paper, some of these numerical studies and considered measurement methods are presented.
The design of a future multi-TeV muon collider needs new ideas to overcome the technological challenges related to muon production, cooling, accumulation and acceleration. In this paper a layout of a positron driven muon source known as the Low EMittance Muon Accelerator (LEMMA) concept is presented. The positron beam, stored in a ring with high energy acceptance and low emittance, is extracted and driven to a multi-target system, to produce muon pairs at threshold. This solution alleviates the issues related to the power deposited and the integrated Peak Energy Density Deposition (PEDD) on the targets. Muons produced in the multi-target system will then be accumulated before acceleration and injection in the collider. A multi-target line lattice has been designed to cope with the focusing of both the positron and muon beams. Studies on the number, material and thickness of the targets have been carried out. A general layout of the overall scheme and a description is presented, as well as plans for future R&D.