In this research, We present a scientific advanced developed
study and keeping up with new studies and technologies of very
short-term electrical load forecasting and applying this study for
electrical load forecasting of basic Syrian electrical p
ower system
by studying this prediction for next four hours according to the
criterion applied in the Syrian Electricity Ministry with ten minutes
intervals ,we call it "Instant electrical load forecasting".