ترغب بنشر مسار تعليمي؟ اضغط هنا

The ENUBET narrow band neutrino beam

274   0   0.0 ( 0 )
 نشر من قبل Matteo Tenti
 تاريخ النشر 2019
  مجال البحث فيزياء
والبحث باللغة English




اسأل ChatGPT حول البحث

The narrow band beam of ENUBET is the first implementation of the monitored neutrino beam technique proposed in 2015. ENUBET has been designed to monitor lepton production in the decay tunnel of neutrino beams and to provide a 1% measurement of the neutrino flux at source. In particular, the three body semi-leptonic decay of kaons monitored by large angle positron production offers a fully controlled $ u_{e}$ source at the GeV scale for a new generation of short baseline experiments. In this contribution the performances of the positron tagger prototypes tested at CERN beamlines in 2016-2018 are presented.

قيم البحث

اقرأ أيضاً

469 - F. Acerbi , A. Berra , M. Bonesini 2020
The uncertainty in the initial neutrino flux is the main limitation for a precise determination of the absolute neutrino cross section. The ERC funded ENUBET project (2016-2021) is studying a facility based on a narrow band beam to produce an intense source of electron neutrinos with a ten-fold improvement in accuracy. Since March 2019 ENUBET is also a Neutrino Platform experiment at CERN: NP06/ENUBET. A key element of the project is the instrumentation of the decay tunnel to monitor large angle positrons produced together with $ u_e$ in the three body decays of kaons ($K_{e3}$) and to discriminate them from neutral and charged pions. The need for an efficient and high purity e/$pi$ separation over a length of several meters, and the requirements for fast response and radiation hardness imposed by the harsh beam environment, suggested the implementation of a longitudinally segmented Fe/scintillator calorimeter with a readout based on WLS fibers and SiPM detectors. An extensive experimental program through several test beam campaigns at the CERN-PS T9 beam line has been pursued on calorimeter prototypes, both with a shashlik and a lateral readout configuration. The latter, in which fibers collect the light from the side of the scintillator tiles, allows to place the light sensors away from the core of the calorimeter, thus reducing possible irradiation damages with respect to the shashlik design. This contribution will present the achievements of the prototyping activities carried out, together with irradiation tests made on the Silicon Photo-Multipliers. The results achieved so far pin down the technology of choice for the construction of the 3 m long demonstrator that will take data in 2021.
The ENUBET facility is a proposed narrow band neutrino beam where lepton production is monitored at single particle level in the instrumented decay tunnel. This facility addresses simultaneously the two most important challenges for the next generati on of cross section experiments: a superior control of the flux and flavor composition at source and a high level of tunability and precision in the selection of the energy of the outcoming neutrinos. We report here the latest results in the development and test of the instrumentation for the decay tunnel. Special emphasis is given to irradiation tests of the photo-sensors performed at INFN-LNL and CERN in 2017 and to the first application of polysiloxane-based scintillators in high energy physics.
150 - K. Suzuki , S. Aoki , A. Ariga 2014
The Tokai-to-Kamioka (T2K) neutrino experiment measures neutrino oscillations by using an almost pure muon neutrino beam produced at the J-PARC accelerator facility. The T2K muon monitor was installed to measure the direction and stability of the muo n beam which is produced together with the muon neutrino beam. The systematic error in the muon beam direction measurement was estimated, using data and MC simulation, to be 0.28 mrad. During beam operation, the proton beam has been controlled using measurements from the muon monitor and the direction of the neutrino beam has been tuned to within 0.3 mrad with respect to the designed beam-axis. In order to understand the muon beam properties,measurement of the absolute muon yield at the muon monitor was conducted with an emulsion detector. The number of muon tracks was measured to be $(4.06pm0.05)times10^4$ cm$^{-2}$ normalized with $4times10^{11}$ protons on target with 250 kA horn operation. The result is in agreement with the prediction which is corrected based on hadron production data.
85 - Fabio Pupilli 2017
The challenges of precision neutrino physics require measurements of absolute neutrino cross sections at the GeV scale with exquisite (1%) precision. This precision is presently limited by the uncertainties on neutrino flux at the source; their reduc tion by one order of magnitude can be achieved monitoring the positron production in the decay tunnel originating from the $K_{e3}$ decays of charged kaons in a sign and momentum selected narrow band beam. This novel technique enables the measurement of the most relevant cross sections for CP violation ($ u_e$ and $overline{ u}_e$) with a precision of 1% and requires a special instrumented beam-line. Such non-conventional beam-line will be developed in the framework of the ENUBET Horizon-2020 Consolidator Grant, recently approved by the European Research Council. The project, the first experimental results on ultra-compact calorimeters that can be embedded in the instrumented decay tunnel and the advances on the simulation of the beamline are presented. We also discuss the detector and accelerator activities that are planned in 2016-2021.
The ENUBET ERC project (2016-2021) is studying a facility based on a narrow band beam capable of constraining the neutrino fluxes normalization through the monitoring of the associated charged leptons in an instrumented decay tunnel. A key element of the project is the design and optimization of the hadronic beamline. In this proceeding we present progress on the studies of the proton extraction schemes. We also show a realistic implementation and simulation of the beamline.
التعليقات
جاري جلب التعليقات جاري جلب التعليقات
سجل دخول لتتمكن من متابعة معايير البحث التي قمت باختيارها
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا