ﻻ يوجد ملخص باللغة العربية
Many physics topics to be studied by the D0 experiment during Run II of the Fermilab Tevatron ppbar collider give rise to final states containing b--flavored particles. Examples include Higgs searches, top quark production and decay studies, and full reconstruction of B decays. The sensitivity to such modes has been significantly enhanced by the installation of a silicon based vertex detector as part of the DO detector upgrade for Run II. Interesting events must be identified initially in 100-200 microseconds to be available for later study. This paper describes custom electronics used in the DO trigger system to provide the real--time identification of events having tracks consistent with the decay of b--flavored particles.
I present the current status of the D0 trigger system in Run II at the Tevatron.
The performance of the D0 experiment forward muon scintillation counters system during Run II of the Tevatron from 2001 to 2011 is described. The system consists of 4214 scintillation counters in six layers. The long term stability of the counters am
The ALICE Central Trigger Processor (CTP) is going to be upgraded for LHC Run 3 with completely new hardware and a new Trigger and Timing Control (TTC-PON) system based on a Passive Optical Network (PON) system. The new trigger system has been design
The CMS Level-1 calorimeter trigger is being upgraded in two stages to maintain performance as the LHC increases pile-up and instantaneous luminosity in its second run. In the first stage, improved algorithms including event-by-event pile-up correcti
The LHCb experiment at CERN is undergoing an upgrade in preparation for the Run 3 data taking period of the LHC. As part of this upgrade the trigger is moving to a fully software implementation operating at the LHC bunch crossing rate. We present an