ترغب بنشر مسار تعليمي؟ اضغط هنا

Beam Commissioning Results from the CBETA Fractional Arc Test

73   0   0.0 ( 0 )
 نشر من قبل Colwyn Gulliford
 تاريخ النشر 2019
  مجال البحث فيزياء
والبحث باللغة English




اسأل ChatGPT حول البحث

This work describes first commissioning results from the Cornell Brookhaven Energy Recovery Test Accelerator Fractional Arc Test. These include the recommissioning of the Cornell photo-injector, the first full energy operation of the main linac with beam, as well as commissioning of the lowest energy matching beamline (splitter) and a partial section of the Fixed Field Alternating gradient (FFA) return loop featuring first production Halbach style permanent magnets. Achieving these tasks required characterization of the injection beam, calibration and phasing of the main linac cavities, demonstration of the required 36 MeV energy gain, and measurement of the splitter line horizontal dispersion and R56 at the nominal 42 MeV. In addition, a procedure for determining the BPM offsets, as well as the tune per cell in the FFA section via scanning the linac energy and inducing betatron oscillations around the periodic orbit in the fractional arc was developed and tested. A detailed comparison of these measurements to simulation is discussed.



قيم البحث

اقرأ أيضاً

234 - E.R. Harms , M. Awida , C. Baffes 2018
A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodu le assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.
118 - E. Harms , K. Carlson , B. Chase 2012
Powered operation of Cryomodule 1 (CM-1) at the Fermilab SRF Beam Test Facility began in late 2010. Since then a series of tests first on the eight individual cavities and then the full cryomodule have been performed. We report on the results of thes e tests and lessons learned which will have an impact on future module testing at Fermilab.
The SwissFEL Injector Test Facility operated at the Paul Scherrer Institute between 2010 and 2014, serving as a pilot plant and testbed for the development and realization of SwissFEL, the X-ray Free-Electron Laser facility under construction at the same institute. The test facility consisted of a laser-driven rf electron gun followed by an S-band booster linac, a magnetic bunch compression chicane and a diagnostic section including a transverse deflecting rf cavity. It delivered electron bunches of up to 200 pC charge and up to 250 MeV beam energy at a repetition rate of 10 Hz. The measurements performed at the test facility not only demonstrated the beam parameters required to drive the first stage of an FEL facility, but also led to significant advances in instrumentation technologies, beam characterization methods and the generation, transport and compression of ultra-low-emittance beams. We give a comprehensive overview of the commissioning experience of the principal subsystems and the beam physics measurements performed during the operation of the test facility, including the results of the test of an in-vacuum undulator prototype generating radiation in the vacuum ultraviolet and optical range.
This design report describes the construction plans for the worlds first multi-pass SRF ERL. It is a 4-pass recirculating linac that recovers the beams energy by 4 additional, decelerating passes. All beams are returned for deceleration in a single b eam pipe with a large-momentum-aperture permanent magnet FFAG optics. Cornell University has been pioneering a new class of accelerators, Energy Recovery Linacs (ERLs), with a new characteristic set of beam parameters. Technology has been prototyped that is essential for any high brightness electron ERL. This includes a DC electron source and an SRF injector Linac with world-record current and normalized brightness in a bunch train, a high-current linac cryomodule, and a high-power beam stop, and several diagnostics tools for high-current and high-brightness beams. All these are now being used to construct a novel one-cryomodule ERL in Cornells Wilson Lab. Brookhaven National Laboratory (BNL) has designed a multi-turn ERL for eRHIC, where beam is transported more than 20 times around the 4km long RHIC tunnel. The number of transport lines is minimized by using two arcs with strongly-focusing permanent magnets that can control many beams of different energies. A collaboration between BNL and Cornell has been formed to investigate this multi-turn eRHIC ERL design by building a 4-turn, one-cryomodule ERL at Cornell. It also has a return loop built with strongly focusing permanent magnets and is meant to accelerate 40mA beam to 150MeV. This high-brightness beam will have applications beyond accelerator research, in industry, in nuclear physics, and in X-ray science.
Over the last years, the generation and acceleration of ultra-short, high quality electron beams has attracted more and more interest in accelerator science. Electron bunches with these properties are necessary to operate and test novel diagnostics a nd advanced high gradient accelerating schemes such as plasma accelerators or dielectric laser accelerators. Furthermore, several medical and industrial applications require high-brightness electron beams. The dedicated R&D facility ARES at DESY will provide such probe beams in the upcoming years. After the setup of the normal-conducting RF photoinjector and linear accelerating structures, ARES successfully started the beam commissioning of the RF gun. This paper gives an overview of the ARES photoinjector setup and summarizes the results of the gun commissioning process. The quality of the first generated electron beams is characterized in terms of charge, momentum, momentum spread and beam size. Additionally, the dependencies of the beam parameters on RF settings are investigated. All measurement results of the characterized beams fulfill the requirements to operate the ARES linac with this RF photoinjector.
التعليقات
جاري جلب التعليقات جاري جلب التعليقات
سجل دخول لتتمكن من متابعة معايير البحث التي قمت باختيارها
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا