ترغب بنشر مسار تعليمي؟ اضغط هنا

The trigger system of the ICARUS experiment for the CNGS beam

113   0   0.0 ( 0 )
 نشر من قبل Angela Fava
 تاريخ النشر 2014
  مجال البحث فيزياء
والبحث باللغة English




اسأل ChatGPT حول البحث

The ICARUS T600 detector, with its 470 tons of active mass, is the largest liquid Argon TPC ever built. Operated for three years in the LNGS underground laboratory, it has collected thousands of CNGS neutrino beam interactions and cosmic ray events with energy spanning from tens of MeV to tens of GeV, with a trigger system based on scintillation light, charge signal on TPC wires and time information (for beam related events only). The performance of trigger system in terms of efficiency, background and live-time as a function of the event energy for the CNGS data taking is presented.


قيم البحث

اقرأ أيضاً

127 - C.-H. Kim , Y. Unno , B.G. Cheon 2020
The Belle II experiment at the SuperKEKB $e^{+}e^{-}$ collider in KEK, Japan, started physics data-taking with a complete detector from early 2019 with the primary physics goal of probing new physics in heavy quark and lepton decays. An online trigge r system is indispensable for the Belle II experiment to reduce the beam background events associated with high electron and positron beam currents without sacrificing the target physics-oriented events. During the Belle II operation upon beam collision, the trigger system must be consistently controlled and its status must be carefully monitored in the process of data acquisition against unexpected situations. For this purpose, we have developed a slow control system for the Belle II trigger system. Around seventy thousand configuration parameters are saved in the Belle II central database server for every run when a run starts and stops. These parameters play an essential role in offline validation of the quality of runs. Around three thousand real-time variables are stored in the Belle II main archiving server, and the trend of some of these variables are regularly used for online and offline monitoring purposes. Various operator interface tools have been prepared and used. When the configuration parameters are not correctly applied, or some of the processes are unexpectedly terminated, the slow control system detects it, stops the data-taking process, and generates an alarm. In this article, we report how we constructed the Belle II trigger slow control system, and how we successfully managed to operate during its initial stage.
The integrated low-level trigger and data acquisition (TDAQ) system of the NA62 experiment at CERN is described. The requirements of a large and fast data reduction in a high-rate environment for a medium-scale, distributed ensemble of many different sub-detectors led to the concept of a fully digital integrated system with good scaling capabilities. The NA62 TDAQ system is rather unique in allowing full flexibility on this scale, allowing in principle any information available from the detector to be used for triggering. The design concept, implementation and performances from the first years of running are illustrated.
The LHCb experiment will operate at a luminosity of $2times10^{33}$ cm$^{-2}$s$^{-1}$ during LHC Run 3. At this rate the present readout and hardware Level-0 trigger become a limitation, especially for fully hadronic final states. In order to maintai n a high signal efficiency the upgraded LHCb detector will deploy two novel concepts: a triggerless readout and a full software trigger.
55 - G. Giacomelli 2007
The CERN to Gran Sasso Neutrino beam (CNGS) was commissioned at CERN in early August 2006 and was first sent at low intensity to Gran Sasso on August 17, 2006. The Borexino, LVD and OPERA experiments continued the commissioning of their detectors and started taking data with practically no dead time. The CNGS collected several hundred events with clean time distributions.
The Icarus T600 detector represents the first example of a fully working large-mass LAr detector. After operations at the LNGS INFN laboratories, it has been refurbished at CERN in 2015-2017 and then installed as far detector on the BNB neutrino beam line at FNAL. The main operations involved in the T600 overhauling are thouroghly described in this paper.
التعليقات
جاري جلب التعليقات جاري جلب التعليقات
سجل دخول لتتمكن من متابعة معايير البحث التي قمت باختيارها
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا