ترغب بنشر مسار تعليمي؟ اضغط هنا

Momentum Cogging at the Fermilab Booster

155   0   0.0 ( 0 )
 نشر من قبل Seiya, Kiyomi
 تاريخ النشر 2013
  مجال البحث فيزياء
والبحث باللغة English




اسأل ChatGPT حول البحث

The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is going to be an issue. The booster accelerates beam from 400 MeV to 8GeV and extracts to The Main Injector (MI). Cogging is the process that synchronizes the extraction kicker gap to the MI by changing radial position of the beam during the cycle. The gap creation occurs at about 700MeV which is 6msec into the cycle. The variation of the revolution frequency from cycle to cycle is larger at lower energy and it is hard to control by changing the radial position because of aperture limitations. Momentum cogging is able to move the gap creation earlier by using dipole correctors and radial position feedback, and controlling the revolution frequency and radial position at the same time. The new cogging is going to save energy loss and aperture. The progress of the momentum cogging system development is going to be discussed in this paper.



قيم البحث

اقرأ أيضاً

The development of magnetic cogging is part of the Fermilab Booster upgrade within the Proton Improvement Plan (PIP). The Booster is going to send 2.25E17 protons/hour which is almost double the present flux, 1.4E17 protons/hour to the Main Injector (MI) and Recycler (RR). The extraction kicker gap has to synchronize to the MI and RR injection bucket in order to avoid a beam loss at the rising edge of the extraction and injection kickers. Magnetic cogging is able to control the revolution frequency and the position of the gap using the magnetic field from dipole correctors while radial position feedback keeps the beam at the central orbit. The new cogging is expected to reduce beam loss due to the orbit changes and reduce beam energy loss when the gap is created. The progress of the magnetic cogging system development is going to be discussed in this paper.
253 - K. Seiya , J. Lackey , W. Marsh 2013
The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour, which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is going to be the source of issues. The booster accelerates beam from 400 MeV to 8 GeV and extracts to the Main Injector. Several percent of the beam is lost within 3 msec after the injection. The aperture at injection energy was measured and compared with the survey data. The magnets are going to be realigned in March 2012 in order to increase the aperture. The beam studies, analysis of the scan and alignment data, and the result of the magnet moves will be discussed in this paper.
At the Fermilab Booster, and many other proton facili-ties, an intense proton beam is accumulated by multi-turn injection of an H- beam through a stripping foil. The circu-lating beam scatters off the injection foil and large-angle Coulomb scattering leads to uncontrolled losses concen-trated in the first betatron period. We measure the foil scat-tering loss rate in the Fermilab Booster as a function of LINAC current, number of injection turns, and time on the injection foil. We find that current Booster operation has ~1% foil scattering loss and we make projections for the Proton Improvement Plan II (PIP-II) injector upgrade. Here we present the results from our recent beam measure-ments and a foil scattering model analyses.
In synchrotron machines, the beam extraction is accomplished by a combination of septa and kicker magnets which deflect the beam from an accelerator into another. Ideally the kicker field must rise/fall in between the beam bunches. However, in realit y, an intentional beam-free time region (aka notch) is created on the beam pulse to assure that the beam can be extracted with minimal losses. In the case of the Fermilab Booster, the notch is created in the ring near injection energy by the use of fast kickers which deposit the beam in a shielded collimation region within the accelerator tunnel. With increasing beam power it is desirable to create this notch at the lowest possible energy to minimize activation. The Fermilab Proton Improvement Plan (PIP) initiated an R&D project to build a laser system to create the notch within a linac beam pulse at 750 keV. This talk will describe the concept for the laser notcher and discuss our current status, commissioning results, and future plans.
358 - K. Seiya , C. Drennan , W. Pellico 2017
The extraction bucket position in the Fermilab Booster is controlled with a cogging process that involves the comparison of the Booster RF count and the Recycler Ring revolution marker. A one RF bucket jitter in the extraction bucket position results from the variability of the process that phase matches the Booster to the Recycler. However, the new slow phase lock process used to lock the frequency and phase of the Booster RF to the Recycler RF has been made digital and programmable and has been modified to correct the extraction notch position. The beam loss at the Recycler injection has been reduced by 20%. Beam studies and the phase lock system will be discussed in this paper.
التعليقات
جاري جلب التعليقات جاري جلب التعليقات
سجل دخول لتتمكن من متابعة معايير البحث التي قمت باختيارها
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا