ﻻ يوجد ملخص باللغة العربية
Software cost estimation (SCE) of a project is pivotal to the acceptance or rejection of the development of software project. Various SCE techniques have been in practice with their own strengths and limitations. The latest of these is object-oriented one. Currently object-oriented approach for SCE is based on Line of Code (LOC), function points, functions and classes etc. Relatively less attention has been paid to the SCE in component-based software engineering (CBSE). So there is a pressing need to search parameters/variables that have a vital role for the SCE using CBSE which is taken up in this paper. This paper further looks at level of significance of all the parameters/variables thus searched. The time is being used as an independent variable because time is a parameter which is almost, all previous in one. Therefore this approach may be in a way an alternate of all previous approaches. Infact the underlying research ultimately may lead towards SCE of complex systems, using CBSE, in a scientific, systematic and comprehensive way.
Because of the importance of object oriented methodologies, the research in developing new measure for object oriented system development is getting increased focus. The most of the metrics need to find the interactions between the objects and module
Because of the importance of object oriented methodologies, the research in developing new measure for object oriented system development is getting increased focus. The most of the metrics need to find the interactions between the objects and module
Applying program analyses to Software Product Lines (SPLs) has been a fundamental research problem at the intersection of Product Line Engineering and software analysis. Different attempts have been made to lift particular product-level analyses to r
Bellwether effect refers to the existence of exemplary projects (called the Bellwether) within a historical dataset to be used for improved prediction performance. Recent studies have shown an implicit assumption of using recently completed projects
Software effort estimation models are typically developed based on an underlying assumption that all data points are equally relevant to the prediction of effort for future projects. The dynamic nature of several aspects of the software engineering p