ترغب بنشر مسار تعليمي؟ اضغط هنا

The Status of Turkic Accelerator Complex Proposal

157   0   0.0 ( 0 )
 نشر من قبل Saleh Sultansoy
 تاريخ النشر 2005
  مجال البحث فيزياء
والبحث باللغة English




اسأل ChatGPT حول البحث

Recently, the Turkic Accelerator Complex (TAC) is proposed as a regional facility for accelerator based fundamental and applied research. The complex will include linac on ring type electron-positron collider as a phi, charm and tau factory, linac based free electron laser (FEL), ring based third generation synchrotron radiation (SR) source and a few GeV proton accelerator. Preliminary estimations show that integral luminosity of hundred inverse femto-barns per year can be achieved for factory options. The FEL facility is planned to obtain laser beam between IR and soft X-ray region. In addition, SR facility will produce photon beams in UV and X-ray region. The proton accelerator will give opportunity to produce muon and neutron beams for applied research. The current status of the conceptual study of the complex is presented.



قيم البحث

اقرأ أيضاً

The Turkic Accelerator Complex (TAC) project has been developed with the support of the Turkish State Planning Organization by the collaboration of 10 Turkish universities. The complex is planned to have four main facilities, namely: SASE FEL Facilit y Based on 1 GeV Electron Linac, Third Generation Synchrotron Radiation Facility (SR) Based on 3.56 GeV Positron Synchrotron, Super-Charm Factory ($sqrt{s} = 3.77$ GeV) by colliding the electron beam coming from the linac with an energy of 1 GeV and positron beam coming through the positron ring with an energy of 3.56 GeV, GeV scale proton accelerator. Later has two-fold goal: Neutron Spallation Source (NSS) and ADS. The proton accelerator construction will have 3 MeV, 100 MeV, and 1 GeV phases. The technical design report is planned to be finished in 2013. Since Turkey has essential Thorium reserves the ADS becomes very attractive for our country as emerging energy technology.
126 - M.E. Convery 2016
We report on the status of the Fermilab accelerator complex, including recent performance, upgrades in progress, and plans for the future. Beam delivery to the neutrino experiments surpassed our goals for the past year. The Proton Improvement Plan is well underway with successful 15 Hz beam operation. Beam power of 700 kW to the NOvA experiment was demonstrated and will be routine in the next year. We are also preparing the Muon Campus to commission beam to the g-2 experiment.
During the preparatory phase of the International Linear Collider (ILC) project, all technical development and engineering design needed for the start of ILC construction must be completed, in parallel with intergovernmental discussion of governance and sharing of responsibilities and cost. The ILC Preparatory Laboratory (Pre-lab) is conceived to execute the technical and engineering work and to assist the intergovernmental discussion by providing relevant information upon request. It will be based on a worldwide partnership among laboratories with a headquarters hosted in Japan. This proposal, prepared by the ILC International Development Team and endorsed by the International Committee for Future Accelerators, describes an organisational framework and work plan for the Pre-lab. Elaboration, modification and adjustment should be introduced for its implementation, in order to incorporate requirements arising from the physics community, laboratories, and governmental authorities interested in the ILC.
90 - H. Karadeniz 2006
TeV center of mass energy lepton-hadron collider is necessary both to clarify fundamental aspects of strong interactions and for adequate interpretation of the LHC data. Recently proposed QCD Explorer utilizes the energy advantage of the LHC proton a nd ion beams, which allows the usage of relatively low energy electron beam. Two options for the LHC based ep collider are posibble: construction of a new electron ring in the LHC tunnel or construction of an e-linac tangentially to the LHC. In the latter case, which seems more acceptable for a number of reasons, two options are under consideration for electron linac: the CLIC technology allows shorter linac length, whereas TESLA technology gives higher luminosity.
88 - J. Chiba , H. Fujii , K. Furukawa 2001
The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the Joint-Project has been approved and recently started its construction at JAERI site at Tokai. The firs t beam commissioning is scheduled in 2006. In parallel with it, a 60-MeV Linac is now being constructed at KEK site at Tsukuba for R&D purpose. Recently the Project has officially decided to use the Experimental Physics and Industrial Control System (EPICS). Under the EPICS environment, we are challenging to implement the Ethernet/IP network for all communication, even at the level of end-point controllers which are so far connected via a field bus. In order to realize such a system, three new controllers (PLCs, WE7000 stations and general-purpose Ethernet boards) are being developed. A prototype EPICS driver for the PLCs works fine and is used to control the ion-source at the KEK Linac.
التعليقات
جاري جلب التعليقات جاري جلب التعليقات
سجل دخول لتتمكن من متابعة معايير البحث التي قمت باختيارها
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا