ﻻ يوجد ملخص باللغة العربية
We report on the status of the Fermilab accelerator complex, including recent performance, upgrades in progress, and plans for the future. Beam delivery to the neutrino experiments surpassed our goals for the past year. The Proton Improvement Plan is well underway with successful 15 Hz beam operation. Beam power of 700 kW to the NOvA experiment was demonstrated and will be routine in the next year. We are also preparing the Muon Campus to commission beam to the g-2 experiment.
After a 14 month shutdown accelerator modifications and upgrades are in place to allow us doubling of the Main Injector beam power. We will discuss the past MI high power operation and the current progress towards doubling the power.
Recently, the Turkic Accelerator Complex (TAC) is proposed as a regional facility for accelerator based fundamental and applied research. The complex will include linac on ring type electron-positron collider as a phi, charm and tau factory, linac ba
Crystal channeling technology has offered various opportunities in the accelerator community with a viability of ultrahigh gradient (TV/m) acceleration for future HEP collider. The major challenge of channeling acceleration is that ultimate accelerat
In this paper, we discuss the possibilities offered to neutrino physics by the upgrades of the CERN accelerator complex. Emphasis is on the physics reach of a medium $gamma$ (350-580) $beta$-beam that fully exploits the improvements in the CERN accel
The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration sectio