ترغب بنشر مسار تعليمي؟ اضغط هنا

The present Report concerns the current status of the Italian Tau/Charm accelerator project and in particular discusses the issues related to the lattice design, to the accelerators systems and to the associated conventional facilities. The project a ims at realizing a variable energy Flavor Factory between 1 and 4.6 GeV in the center of mass, and succeeds to the SuperB project from which it inherits most of the solutions proposed in this document. The work comes from a cooperation involving the INFN Frascati National Laboratories accelerator experts, the young newcomers, mostly engineers, of the Cabibbo Lab consortium and key collaborators from external laboratories.
The test of the crab waist collision scheme, undergoing at the e+e- Frascati DAFNE accelerator complex since February 2008, requires a fast and accurate measurement of the absolute luminosity, as well as a full characterization of the background cond itions. Three different monitors, a Bhabha calorimeter, a Bhabha GEM tracker and a gamma bremsstrahlung proportional counter have been designed, tested and installed around the interaction point end of 2007-beginning of 2008. In this paper, we describe these detectors and present their performances in various operation conditions during the 2008 and 2009 DAFNE runs.
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا