ترغب بنشر مسار تعليمي؟ اضغط هنا

The demanding beam performance requirements of the High Luminosity (HL-) LHC project translate into a set of requirements and upgrade paths for the LHC injector complex. In this paper the performance requirements for the SPS and the known limitations are reviewed in the light of the 2012 operational experience. The various SPS upgrades in progress and still under consideration are described, in addition to the machine studies and simulations performed in 2012. The expected machine performance reach is estimated on the basis of the present knowledge, and the remaining decisions that still need to be made concerning upgrade options are detailed.
66 - H. Bartosik 2013
After a successful scrubbing run in the beginning of 2011, the LHC can be presently operated with high intensity proton beams with 50 ns bunch spacing. However, strong electron cloud effects were observed during machine studies with the nominal beam with 25 ns bunch spacing. In particular, fast transverse instabilities were observed when attempting to inject trains of 48 bunches into the LHC for the first time. An analysis of the turn-by-turn bunch-bybunch data from the transverse damper pick-ups during these injection studies is presented, showing a clear signature of the electron cloud effect. These experimental observations are reproduced using numerical simulations: the electron distribution before each bunch passage is generated with PyECLOUD and used as input for a set of HEADTAIL simulations. This paper describes the simulation method as well as the sensitivity of the results to the initial conditions for the electron build-up. The potential of this type of simulations and their clear limitations on the other hand are discussed.
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا