Do you want to publish a course? Click here

Development of the 50-Mev DTL for the Jaeri/Kek Joint Project

75   0   0.0 ( 0 )
 Added by Fujio Naito
 Publication date 2000
  fields Physics
and research's language is English




Ask ChatGPT about the research

An Alvaretz-type DTL, to accelerate the H- ion beam from 3 to 50 MeV, is being constructed as the injector for the JAERI/KEK Joint Project. The following components of the DTL have been developed: (1) a cylindrical tank, made by copper electroforming; (2) rf contactors; (3) a pulse-excited quadrupole magnet with a hollow coil made by copper electroforming; (4) a switching-regulator-type pulsed-power supply for the quadrupole magnet. High-power tests of the components have been conducted using a short-model tank. Moreover a breakdown experiment of the copper electrodes has been carried out in order to study the properties of several kinds of copper materials.



rate research

Read More

84 - M.Mizumoto , N.Ouchi , J.Kusano 2000
The JAERI/KEK Joint Project for the high-intensity proton accelerator facility has been proposed with a superconducting (SC) linac option from 400 MeV to 600MeV. System design of the SC linac has been carried out based on the equipartitioning concept. The SC linac is planned to use as an injector to a 3GeV rapid cycling synchrotron (RCS) for spallation neutron source after it meets requirement to momentum spread less than +-0.1%. In the R&D work for SC cavities, vertical tests of single-cell and 5 cell cavities were performed. Experiments on multi-cell (5 cell) cavities of b=0.50 and b=0.89 at 2K were carried out with values of maximum electric surface peak fields of 23MV/m and 31MV/m, respectively. A model describing dynamic Lorentz detuning for SC cavities has been developed for pulse mode operation. Validity of the model was confirmed experimentally to simulate the performance.
Quadrupole electromagnets have been developed with a hollow coil produced using an improved periodic reverse electroforming. These will be installed in each of the drift tubes of the DTL (324 MHz) as part of the JAERI/KEK Joint Project at the high-intensity proton accelerator facility. Measurements of the magnets properties were found to be consistent with computer-calculated estimated. The details of the design, the fabrication process, and the measurement results for the quadrupole magnet are described.
58 - S. Fukuda , A. Anami , C. Kubota 2000
The construction of the 60-MeV proton linac has started as a low-energy front of the KEK/JAERI Joint Project for a high-intensity proton accelerator facility at KEK. The accelerating frequency is 324 MHz. Five UHF klystrons are used as an rf source; their ratings have a maximum power of 3 MW, a beam pulse width of a 700 micro-sec (an rf pulse width is 650 micro-sec) and a repetition rate of 50 pps. We have manufactured a proto-type rf source (a power-supply system with a modulating-anode pulse modulator and prototype klystrons). In this paper, the specifications and developments of the rf source, including the WR-2300 waveguide system, are summarized. During the manufacturing process, strong oscillations due to back-going electrons from the collector were observed. This phenomenon was analyzed both experimentally and theoretically. We have tested up to an output power of nearly 3 MW, and succeeded to test the DTL hot-model structure.
88 - J. Chiba , H. Fujii , K. Furukawa 2001
The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the Joint-Project has been approved and recently started its construction at JAERI site at Tokai. The first beam commissioning is scheduled in 2006. In parallel with it, a 60-MeV Linac is now being constructed at KEK site at Tsukuba for R&D purpose. Recently the Project has officially decided to use the Experimental Physics and Industrial Control System (EPICS). Under the EPICS environment, we are challenging to implement the Ethernet/IP network for all communication, even at the level of end-point controllers which are so far connected via a field bus. In order to realize such a system, three new controllers (PLCs, WE7000 stations and general-purpose Ethernet boards) are being developed. A prototype EPICS driver for the PLCs works fine and is used to control the ion-source at the KEK Linac.
267 - N. Eddy , C. Briegel , B. Fellenz 2012
A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R&D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and processing, and also implements a new automatic gain error correction schema. The technical concept and realization as well as results of beam studies are presented.
comments
Fetching comments Fetching comments
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا