Do you want to publish a course? Click here

Progress Toward Doubling the Beam Power at Fermilabs Accelerator Complex

116   0   0.0 ( 0 )
 Added by Kourbanis, Ioanis
 Publication date 2014
  fields Physics
and research's language is English
 Authors I. Kourbanis




Ask ChatGPT about the research

After a 14 month shutdown accelerator modifications and upgrades are in place to allow us doubling of the Main Injector beam power. We will discuss the past MI high power operation and the current progress towards doubling the power.



rate research

Read More

126 - M.E. Convery 2016
We report on the status of the Fermilab accelerator complex, including recent performance, upgrades in progress, and plans for the future. Beam delivery to the neutrino experiments surpassed our goals for the past year. The Proton Improvement Plan is well underway with successful 15 Hz beam operation. Beam power of 700 kW to the NOvA experiment was demonstrated and will be routine in the next year. We are also preparing the Muon Campus to commission beam to the g-2 experiment.
103 - B. Aurand , I. Bailey , C. Bartels 2009
In this contribution accelerator solutions for polarized beams and their impact on physics measurements are discussed. Focus are physics requirements for precision polarimetry near the interaction point and their realization with polarized sources. Based on the ILC baseline programme as described in the Reference Design Report (RDR), recent developments are discussed and evaluated taking into account physics runs at beam energies between 100 GeV and 250 GeV, as well as calibration runs on the Z-pole and options as the 1TeV upgrade and GigaZ.
The design and parameters of the polarized-beam facility at U-70 proton synchrotron of NRC Kurchatov Institute - IHEP are presented. The new beamline 24A will provide the polarized proton and antiproton beams for carrying out the rich physics program of the SPASCHARM experiment for comprehensive studies of spin phenomena in a wide spectrum of hadronic reactions in the energy range of 10-45 GeV.
During Nova operations it is planned to run the Fermilab Recycler in a 12 batch slip stacking mode. In preparation for this, measurements of the tune during a six batch injection and then as the beam is slipped by changing the RF frequency, but without a 7th injection, have been carried out in the Main Injector. The coherent tune shifts due to the changing beam intensity were measured and compared well with the theoretically expected tune shift. The tune shifts due to changing RF frequency, required for slip stacking, also compare well with the linear theory, although some nonlinear affects are apparent at large frequency changes. These results give us confidence that the expected tunes shifts during 12 batch slip stacking Recycler operations can be accommodated.
New crystal technique - array of bent strips and a fan-type reflector, based on thin straight plates - have been used for research of extraction and collimation a circulating beam in the U-70 accelerator at the energy 50 GeV and 1.3 GeV. It is shown, that new devices can effectively steer a beam in a wide energy range. For protons with energy 50 GeV efficiency of extraction and collimation about 90 % has been achieved which is record for this method. Reduction of particle losses in 2-3 times was observed also in accelerator at application of different crystals in comparison with the usual one-stage collimation scheme of beam with a steel absorber.
comments
Fetching comments Fetching comments
Sign in to be able to follow your search criteria
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا