Vertex detector cable requirements are considered within the context of the SiD concept. Cable material should be limited so that the number of radiation lengths represented is consistent with the material budget. In order to take advantage of the proposed accelerator beam structure and allow cooling by flow of dry gas, pulsed power is assumed. Potential approaches to power distribution, cable paths, and cable design for operation in a 5 T magnetic field are described.