J-PARC Neutrino Beamline Upgrade Technical Design Report


الملخص بالإنكليزية

In this document, technical details of the upgrade plan of the J-PARC neutrino beamline for the extension of the T2K experiment are described. T2K has proposed to accumulate data corresponding to $2times{}10^{22}$ protons-on-target in the next decade, aiming at an initial observation of CP violation with $3sigma$ or higher significance in the case of maximal CP violation. Methods to increase the neutrino beam intensity, which are necessary to achieve the proposed data increase, are described.

تحميل البحث