PIP-II Injector Tests Low Energy Beam Transport: Commissioning and Selected Measurements


الملخص بالإنكليزية

The PIP2IT test accelerator is under construction at Fermilab. Its ion source and Low Energy Beam Transport (LEBT) in its initial (straight) configuration have been commissioned to full specification parameters. This paper introduces the LEBT design and summarizes the outcome of the commissioning activities.

تحميل البحث