Progress Toward Doubling the Beam Power at Fermilabs Accelerator Complex
نشر في Kourbanis, Ioanis
بتاريخ 2014
في مجال فيزياء
والبحث باللغة
English
تحميل البحث
الملخص بالإنكليزية
After a 14 month shutdown accelerator modifications and upgrades are in place to allow us doubling of the Main Injector beam power. We will discuss the past MI high power operation and the current progress towards doubling the power.