Do you want to publish a course? Click here

In-flight verification of the FREGATE spectral response

69   0   0.0 ( 0 )
 Added by Olive J.-F.
 Publication date 2002
  fields Physics
and research's language is English




Ask ChatGPT about the research

We present the first results of the in-flight validation of the spectral response of the FREGATE X/gamma detectors on-board the HETE-2 satellite. This validation uses the Crab pulsar and nebula as reference spectra.



rate research

Read More

406 - J-L. Atteia , M. Boer , F. Cotin 2002
The gamma-ray detector of HETE-2, called FREGATE, has been designed to detect gamma-ray bursts in the energy range [6-400] keV. Its main task is to alert the other instruments of the occurrence of a gamma-ray burst (GRB) and to provide the spectral coverage of the GRB prompt emission in hard X-rays and soft gamma-rays. FREGATE was switched on on October 16, 2000, one week after the successful launch of HETE-2, and has been continuously working since then. We describe here the main characteristics of the instrument, its in-flight performance and we briefly discuss the first GRB observations.
We discuss the flight calibration of the spectral response of the Advanced CCD Imaging Spectrometer (ACIS) on-board the Chandra X-ray Observatory (CXO). The spectral resolution and sensitivity of the ACIS instrument have both been evolving over the course of the mission. The spectral resolution of the frontside-illuminated (FI) CCDs changed dramatically in the first month of the mission due to radiation damage. Since that time, the spectral resolution of the FI CCDs and the backside-illuminated (BI) CCDs have evolved gradually with time. We demonstrate the efficacy of charge-transfer inefficiency (CTI) correction algorithms which recover some of the lost performance. The detection efficiency of the ACIS instrument has been declining throughout the mission, presumably due to a layer of contamination building up on the filter and/or CCDs. We present a characterization of the energy dependence of the excess absorption and demonstrate software which models the time dependence of the absorption from energies of 0.4 keV and up. The spectral redistribution function and the detection efficiency are well-characterized at energies from 1.5 to 8.0 keV. The calibration at energies below 1.5 keV is challenging because of the lack of strong lines in the calibration source and also because of the inherent non-linear dependence with energy of the CTI and the absorption by the contamination layer. We have been using data from celestial sources with relatively simple spectra to determine the quality of the calibration below 1.5 keV. The analysis of these observations demonstrate that the CTI correction recovers a significant fraction of the spectral resolution of the FI CCDs and the models of the time-dependent absorption result in consistent measurements of the flux at low energies for data from a BI (S3) CCD.
571 - O. Godet 2008
(Abbreviated) We show that the XRT spectral response calibration was complicated by various energy offsets in photon counting (PC) and windowed timing (WT) modes related to the way the CCD is operated in orbit (variation in temperature during observations, contamination by optical light from the sunlit Earth and increase in charge transfer inefficiency). We describe how these effects can be corrected for in the ground processing software. We show that the low-energy response, the redistribution in spectra of absorbed sources, and the modelling of the line profile have been significantly improved since launch by introducing empirical corrections in our code when it was not possible to use a physical description. We note that the increase in CTI became noticeable in June 2006 (i.e. 14 months after launch), but the evidence of a more serious degradation in spectroscopic performance (line broadening and change in the low-energy response) due to large charge traps (i.e. faults in the Si crystal) became more significant after March 2007. We describe efforts to handle such changes in the spectral response. Finally, we show that the commanded increase in the substrate voltage from 0 to 6V on 2007 August 30 reduced the dark current, enabling the collection of useful science data at higher CCD temperature (up to -50C). We also briefly describe the plan to recalibrate the XRT response files at this new voltage.
In this paper we discuss the Planck-LFI in-flight calibration campaign. After a brief overview of the ground test campaigns, we describe in detail the calibration and performance verification (CPV) phase, carried out in space during and just after the cool-down of LFI. We discuss in detail the functionality verification, the tuning of the front-end and warm electronics, the preliminary performance assessment and the thermal susceptibility tests. The logic, sequence, goals and results of the in-flight tests are discussed. All the calibration activities were successfully carried out and the instrument response was comparable to the one observed on ground. For some channels the in-flight tuning activity allowed us to improve significantly the noise performance.
We present a spectral analysis of 35 GRBs detected with the HETE-2 gamma-ray detectors (the FREGATE instrument) in the energy range 7-400 keV. The GRB sample analyzed is made of GRBs localized with the Wide Field X-ray Monitor onboard HETE-2 or with the GRB Interplanetary Network. We derive the spectral parameters of the time-integrated spectra, and present the distribution of the low-energy photon index, alpha, and of the peak energy, e_peak . We then discuss the existence and nature of the recently discovered X-Ray Flashes and their relationship with classical GRBs.
comments
Fetching comments Fetching comments
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا