The ICARUS T600 LAr TPC is the far detector of the Short Baseline Program at FNAL. As it will have to work at shallow depth in the Booster Neutrino Beam, a large cosmic rays background ($sim 11$ kHz) will be present. To reduce it, precise timing information is needed from the new light detection system, based on 360 large area photomultipliers. For precise time measurements a calibration system based on a fast laser diode and a system based on one optical switch, several $1 times 10$ fused fiber splitters, ultra-high vacuum optical feedthroughs and multimode optical patchcords up to 20 m long, to distribute the laser pulses to each single PMT, was designed. The time evolution of the PMTs gain/timing and possibly their initial calibrations at a time $t_0$ will be done by using this system. The expected time resolution of this calibration system will be around 100 ps. The laboratory tests needed to set up the system are reported.



rate research

Read More

The INFN and the ICARUS collaboration originally developed the technology of the LAr-TPC. Located the underground LNGS Hall-B, the ICARUS T600 detector has been performed over three years with remarkable detection efficiency featuring a smooth operation, high live time, and high reliability. About 3000 CNGS neutrino events have been collected and are being actively analyzed. ICARUS will now be moved to CERN for an extensive R&D program. The T600 detector will be overhauled and complemented with a similar T150 detector. These improvements are performed in collaboration with the LBNE experiment, of which several INFN Institutions are now members. As a novelty, a SC magnetic field of about 1 T will be introduced. During 2016 it is proposed to move the experiment to FNAL where short base line neutrino beams are available, complementing the approved MicroBooNe experiment which will start operation in 2014. The ICARUS detectors at FNAL will be an important addition since, in absence of anomalies, the signals of several detectors at different distances from the target should be a copy of each other for all experimental signatures. Due to the reduced mass, in MicroBooNE the anti-neutrino signal is too weak for a sensitive comparison. Hence, a definitive clarification of the LSND anomaly requires the exploration of the anti-neutrino signal provided by the much larger T600. The magnetic field will allow separating the anti-neutrino signal from the neutrino-induced background. It is proposed to expose the T600 at the Booster NuBeam at ~700 m from target; the T150 will be located at ~150 m. The T600 will also receive >10^4 nu_e events/year from the off-axis NUMI beam peaked around 1 GeV and exploitable to prepare for the LBNE experiment. The ICARUS teams are also interested in extending the participation to other short baseline neutrino activities collaborating with existing FNAL groups.
The accumulation of positive ions, produced by ionizing particles crossing Liquid Argon Time Projection Chambers (LAr-TPCs), may generate distortions of the electric drift field affecting the track reconstruction of the ionizing events. These effects could become relevant for large LAr-TPCs operating at surface or at shallow depth, where the detectors are exposed to a copious flux of cosmic rays. A detailed study of such possible field distortions in the ICARUS T600 LAr-TPC has been performed analyzing a sample of cosmic muon tracks recorded with one T600 module operated at surface in 2001. The maximum track distortion turns out to be of few mm in good agreement with the prediction by a numerical calculation. As a cross-check, the same analysis has been performed on a cosmic muon sample recorded during the ICARUS T600 run at the LNGS underground laboratory, where the cosmic ray flux was suppressed by a factor $sim 10^6$ by 3400 m water equivalent shielding. No appreciable distortion has been observed, confirming that the effects measured on surface are actually due to ion space charge.
The Icarus T600 detector represents the first example of a fully working large-mass LAr detector. After operations at the LNGS INFN laboratories, it has been refurbished at CERN in 2015-2017 and then installed as far detector on the BNB neutrino beamline at FNAL. The main operations involved in the T600 overhauling are thouroghly described in this paper.
The ICARUS T600 liquid argon (LAr) time projection chamber (TPC) underwent a major overhaul at CERN in 2016-2017 to prepare for the operation at FNAL in the Short Baseline Neutrino (SBN) program. This included a major upgrade of the photo-multiplier system and of the TPC wire read-out electronics. The full TPC wire read-out electronics together with the new wire biasing and interconnection scheme are described. The design of a new signal feed-through flange is also a fundamental piece of this overhaul whose major feature is the integration of all electronics components onto the signal flange. Initial functionality tests of the full TPC electronics chain installed in the T600 detector at FNAL are also described.
ICARUS T600 is the far detector of the Short Baseline Neutrino program at Fermilab(USA), which foresees three Liquid Argon Time Projection Chambers along the Booster Neutrino Beam line to search for LSND-like sterile neutrino signal. The T600 detector underwent a significant overhauling process at CERN, introducing new technological developments while maintaining the already achieved performances. The realization of a new liquid argon scintillation light detection system is a primary task of the detector overhaul. As the detector will be subject to a huge flux of cosmic rays, the light detection system should allow the 3D reconstruction of events contributing to the identification of neutrino interactions in the beam spill gate. The design and implementationof the new scintillation light detection system of ICARUS T600 is described.